BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work and paving for a mixed-use development in Arlington, Virginia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Question Deadline 03/07/2025 at 5:00 PM ET QUESTIONS REGARDING THE ORIGINAL SOLICITATION MUST BE SUBMITTED BIDDERS MUST BE REGISTERED IN PRISM+ TO SUBMIT A QUESTION FOR THIS INVITATION TO BID. This project proposes street section improvements for approximately 2,250 linear feet of South Walter Ree d Drive between 5th Street South and Columbia Pike. The scope of work includes multi-modal street improvements that consist of protected bicycle lanes, sidewalks, re-alignment of street intersections, driveways aprons, regrading of street section with full depth asphalt replacement, milling and paving, landscaped medians, installation of floating island bus stops, and associated storm sewer drainage infrastructure as well as pavement striping, marking and signage associated with the street improvement work. The intersection of 9th Street S and S Walter Ree d Drive including installation of the signal infrastructure will be completed first, and is designated as Phase 1. The project also includes street trees along the whole street section improvements which will be installed under separate contract. The scope for this project shall include, but is not limited to, coordination with adjacent developments including the Arlington Public Schools development along the western frontage between 7th Street South and 9th Street South, as well as with the Arlington County Columbia Pike Streets project at the project limits. The Contractor shall provide all resources to successfully perform the terms of this contract in accordance with project plans, and in compliance with Arlington County and VDOT Standards and Specifications. The Contractor shall perform the work complete, in place, tested, and ready for continuous service. All work within the VDOT Right-Of-Way shall be performed in accordance with the VDOT Standards and Specifications, unless otherwise noted. All work within the County Right-OfWay shall be in accordance with the Arlington County Standards and Specifications, unless otherwise noted. This project proposes improvements to approximately 2,250 linear feet of South Walter Re ed Drive, between 5th Street South and Columbia Pike. The scope includes multi-modal street improvements such as protected bike lanes, sidewalk improvements, intersection realignments, driveway apron upgrades, full depth asphalt replacement, milling and paving, landscaped medians, and floating island bus stops. Additional work includes stormwater drainage upgrades, pavement markings, and signage

Bid Results

Roads / Highways

$5,876,515.00

Public - County

Paving, Site Work

135

14

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
168
Bidding Soon
2,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

May 19, 2025

Project location map

Walter Reed Dr, Arlington, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.