BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a water / sewer project in Woodville, Ohio. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Construction of a new 150,000 gallon elevated water storage tank and a new 12" waterline, cathodic protection, tank mixer, demolition of the existing 100,000 gallon elevated water storage tank, and other appurtenances. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) A certified check, cashier's check or letter of credit in favor of The Village of Woodville in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Sandusky County, Ohio. The Village of Woodville reserves the right pursuant to ORC.9.312 to reject any and all bids and to waive any non-material irregularity in determining the lowest responsive and responsible bidder. This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs) No bidder may withdraw his bid for a period of 60 days after the scheduled closing time for the receipt of bids. The successful bidder will be required to pay federally-determined Davis-Bacon Wage Rates or Ohio Prevailing Wage Rates, whichever is greater. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Engineer's estimate of probable cost for this project is $1,800,000.00

Post-Bid

Water / Sewer

$1,800,000.00

Public - City

Site Work

10

12

6

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
170
Bidding Soon
2,120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 14, 2025

Project location map

209 N Walnut St, Woodville, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.