EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2025 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Saint Helens, Oregon. Contact the soliciting agency for additional information.

The City of St. Helens, Oregon is seeking proposals from qualified and experienced consulting firms to complete a comprehensive capacity study for the Belton Road Sewer Step System in St. Helens. Work for this project includes preparing a System Capacity Report which summarizes the modelling methods and available capacity. Work also includes a site survey to obtain the locations of all connected pumps and laterals to the existing system. The consultant must demonstrate experience in preparing Sanitary Sewer Capacity Studies. Proposals shall be submitted in a sealed envelope plainly identifying City of St. Helens Engineering Department, Belton Step System Capacity Study, RFP No. S-685, and shall include the Consultant Name and Address. Proposals shall be addressed to Mouhamad Zaher, Public Works Director, City of St. Helens, 265 Strand Street, St. Helens, OR 97051. It is the responsibility of the proposer to ensure that any proposals submitted have sufficient time to be received by the City of St. Helens Engineering Division prior to the proposal due date and time. Responses to this RFP will be reviewed, scored, and ranked according to the criteria and process defined in this RFP. The Consultant selected for contract negotiations will be the firm selected as the most qualified through the RFP's evaluation process. For questions or clarifications regarding this RFP please contact Alexander Bird, Engineer II, at abird@sthelensoregon.gov or (503) 366-8223. The City of St. Helens reserves the right to reject any response not in compliance with all prescribed solicitation procedures and requirements and other applicable law and may reject any or all responses in whole or in part when the cancellation or rejection is in the best interest of the City, and at no cost to the City. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
42
Bidding Soon
559
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP - Belton Road Sewer Step System Capacity Study

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.