Site work and paving for a mixed-use development in Inver Grove Heights, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 21, 2025, the project was awarded to Bituminous Roadways, Inc. with an awarded amount of $8,479,730.36..** Said proposals for the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities: Remove Bituminous Pavement 24,000 SY RCP Storm Sewer 5,100 LF Full Depth Reclamation 29,800 SY 8" PVC Pipe Sewer 6,600 LF Mill Bituminous Surface (2") 610 SY 8" DIP Watermain 6,700 LF Type SP 12.5 Wearing Course Mix (3,C) 6,600 TONS Concrete Curb & Gutter 20,000 LF Type SP 19.0 None Wearing Course Mix (3,C) 9,000 TONS Sodding Type Salt Tolerant 67,700 SY For this project we will accept only online electronic bids through website. Instructions for online bidding are included in the Project Specifications. The bid bonds must be payable to the City of Inver Grove Heights in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages if the bid is accepted, and the bidder shall fail to promptly enter a written contract and furnish the required bond. The City of Inver Grove Heights reserves the right to reject any or all bids, to waive informalities, and to award the bid in the best interest of the City. No bids may be withdrawn for a period of 60 days. The Council will consider such bids in the Council Chambers at 6:00 p.m. Monday, March 24, 2025. All questions regarding the Plans and Contract Documents are to be submitted to the Engineer in writing. Direct questions about this Project, including pre-bid questions, to Paul Merchlewicz, P.E. at (651) 450-2572 and/or pmerchlewicz@ighmn.gov. SCOPE OF WORK This Project includes bituminous mill and overlay, full-depth reclamation, full reconstruction, curb and gutter replacement, sidewalk replacement, storm sewer system replacements and improvements, sanitary sewer system replacements and improvements, water system replacements and improvements, erosion control, bituminous paving, turf establishment, and adjustment of castings and gate valve boxes. The Work to be carried out under these General Requirements includes furnishing all labor, material, tools, and equipment necessary for the construction of the proposed improvements, complete in place as described in the Plans and Specifications herein. Minor appurtenances not specifically listed as bid items, but which are necessary to complete the project in a satisfactory manner, as shown in the Plans, will be considered incidental. The City reserves the right to add or remove quantities based on field conditions during construction. This will not result in contract unit price adjustments. An allowance has been included for Landscape Contingency. Payment shall be based on invoices submitted and approved for work completed to salvage and reinstall landscape structures and landscaping.

Award

Roads / Highways

$8,479,730.00

Public - City

Paving, Site Work

210

10

55

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
85
Bidding Soon
1,036
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 28, 2025

img_map_placeholder

46th St E, Inver Grove Heights, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Pavement Management Initiative

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.