BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work and paving for a sidewalk / parking lot in Teton, Idaho. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bids will be received for a single contract on a unit price basis. The project consists of constructing approximately 1,560 yd.2 of 4" and 75 yd.2 of 6" concrete sidewalk along Main Street (Idaho Highway 33) including excavation and gravel preparation work, sidewalk and ADA access construction, curb stop cover adjustments, and other related work. A pre-bid conference will not be held. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Teton in an amount not less than five percent (5%) of the total amount of the bid. Successful Bidder shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful Bidder as evidenced by a certificate of insurance. This project is funded in part by federal funds distributed through the Idaho Local Highway Technical Assistance Council (LHTAC), who is not a party to this Invitation to Bid or any resulting contract. Idaho requirements for public works contracting will apply. Federal requirements for project documentation, Title VI of the Civil Rights Act, Americans with Disabilities Act, and the Davis-Bacon Act including payment of prevailing Davis-Bacon wage rates, are required on this project as described in the Contract Documents. Award of the contract will be contingent upon compliance with Idaho public works contracting requirements, bid requirements, and available project funding. No bid may be withdrawn after the scheduled time for the public opening of bids as set forth above. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed forty-five (45) days, and to accept the lowest responsive and responsible bid which is in the best interest of the Owner. The Engineer for this project is: The Dyer Group, LLC Attn: Winston (Dick) Dyer, PE 343 E 4 th North, Suite 108 Rexburg, ID 83440 208-390-9700 c wdyer@thedyergroup.com

Award

Sidewalks / Parking Lot

$207,075.00

Public - City

Paving, Site Work

11

9

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

May 5, 2025

Project location map

W Main St, Teton, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.