BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 9, 2025

Site work for a water / sewer project in Nampa, Idaho. Working plans call for site work for a water / sewer project.

As of May 7, 2025, project will be rebid, no rebid date yet Reuse Compliance - 15.0 Extension Pipeline The Project includes the following Work: The work covered under this contract will be performed along Moses Drain, within the existing Moses Drain easement. The overall project will consist of a furnishing and installing Solid Wall PVC irrigation pipeline of approximately 3,600 lineal feet. The gravity irrigation pipe alignment will collect drainage from the existing 15.0 North Lateral traveling west along Homedale Road and flow northwest along the eastern bank of Moses Drain. This first section of irrigation pipe will be 18-inches in diameter and will collect flow from the 15.0 South Lateral, which flows north along N Midway Road. The irrigation pipe will increase to a 24-inch pipe after connecting with the South Lateral. An existing storm drain pipe will require relocation at the South Lateral connection. The irrigation pipeline will continue to flow northwest along the eastern bank of the Moses Drain. The pipeline will connect to the existing Highline Canal concrete structure north of Laster Street. Bids are requested for the following Contract: Reuse Compliance - 15.0 Extension Pipeline/PWWWUPPH2F The project has an expected duration of 120 calendar days. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids must be accompanied by Bid Security in the form of a bid bond, certified check, cashiers check or cash in the amount of FIVE PERCENT (5%) of the amount of the bid proposal. Said bid security shall be forfeited to the City of Nampa as liquidated damages should the successful bidder fail to enter into contract in accordance with their proposal as specified in the Instructions to Bidders. City of Nampa reserves the right to reject any or all proposals, waive any nonmaterial irregularities in the bids received, and to accept the proposal deemed most advantageous to the best interest of the City of Nampa. Question Deadline 03/06/2025 Biddershallsubmit all questions aboutthe meaning orintent of the Bidding Documentsto Owner in writing. Contact information and submittal procedures for such questions are as follows: A. Email questions to Logan Branscum at BranscumL@cityofnampa.us.

Final Planning

Water / Sewer

$500,000.00

Public - City

Site Work

13

52

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
34
Bidding Soon
316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

October 7, 2025

Project location map

Multiple Locations, Nampa, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.