Published April 5, 2025 at 8:00 PM

Updated April 6, 2025

Site work and paving for a mixed-use development in Safford, Arizona. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

Owens Family Park Improvements: New Parking Lot and Street Project NIB #PK2003 The City of Safford (City), Arizona hereby invites the submission of sealed Bids from properly licensed contractors for the project Owens Family Park Improvements: New Parking Lot and Street located off the intersection of El Paso Boulevard, 20th Street, and 14th Avenue (Lat. 32 49 01 N, Long. 109 43 33 W). The Project includes material purchases to complete installation of 3,363 square feet of new sidewalk (replacing 425 square feet of existing sidewalk and curb needing removal), 585 linear feet of 6 vertical curb and gutter, 271 linear feet of single curb, 1,868 square yards of 12 AB, 1,161 square yards of 4 AC pavement, 6,364 square feet of 4 concrete, and ancillary sidewalk and street features. The Project is expected to take between 3-4 months, but no more than 120 calendar days from the issuance of the Notice to Proceed. The anticipated date of Council approval of the Contract is April 14, 2025, and the City wishes for the awarded Contractor to begin work that same week. All Bids must include a bid bond for 10% of the Total Bid amount, The City reserves the right to reject any or all Bids, or to withhold the award for any reason the City determines. The City also reserves its right to hold any or all Bids for sixty (60) days after the Bid opening date and will not allow withdrawal of Bids during those sixty (60) days. Question Deadline 03/13/2025 Last Day for Questions: For Technical Questions: Andi Lindsey Lance Henrie, P.E. Contract Specialist Public Works Director 928.432.4190 lhenrie@saffordaz.gov Office hours: Mon-Thurs 7AM-6PM The Work is generally described as follows: The City of Safford (City) is requesting quotes for the construction of a paved roadway and concrete parking lot west of the intersection of 14 th Avenue and El Paso Boulevard in Safford, Arizona 85546. The space prepared for this project will be accomplished by City of Safford and will consist of the rough grading as designed. The Work shall consist of fine grading and installation of a paved roadway with curb, gutter, sidewalk and ramps as well as a concrete parking lot with driveways, curbs, gutters, sidewalks and ramps per the plans as designed with any tools and labor required to complete the project. Time is of the essence for this project. The City plans to obtain Council approval for this Contract Monday, April 14, 2025, and wishes for the Successful Bidder to begin work that same week

Bid Results

Sidewalks / Parking Lot

$348,268.00

Public - City

Paving, Site Work

9

7

15

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
8
Bidding Soon
154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 21, 2025

Project location map

W El Paso Blvd and 14th Ave & W 20th St, Safford, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.