Site work, paving and new construction of a mixed-use development in South Fork, Colorado. Completed plans call for the construction of a municipal facility; sidewalk / parking lot; and 2,960-square-foot playground / park / athletic field.

Reference Number 0000377129 Bid Intent: Not Available Job Location: 25313 US 160, South Fork, CO 81154 Estimated Contract Cost: $2,500,000.00 Project Description: Qualified contractors are invited to bid on the construction of a new 2,960 SF rest area building and associated utility and site work. The project site is located at the existing Shaw Creek Rest Area in South Fork. The rest area will be closed to the public for the construction project. Prior to the General Contractor taking control of the site, CDOT will demolish the existing buildings and foundations on site. See Demolition Plan C002 for more information. The new rest area building will be a 2.960 gross square foot wood-framed structure with fiber cement siding, stone veneer, and sloped standing-seam metal roofs. The building will contain an entry area with two sets of entry doors, public men's, women's, family restrooms, and vending area; and staff office, break room, and restroom, with storage, mechanical and garage spaces. The garage space will be used to store a pick-up truck with plow, tractor with plow, snow-blowers, mowers, and other maintenance equipment. The flooring shall be sealed concrete slab-on-grade, with a steel trowel finish in the garage area and a polished finish in most of the rest of the spaces. The project will also include site work such as roto-milling and removing asphalt, placing new asphalt, new concrete curbs and flatwork, installing new traffic signage and pavement striping. There is also a bid Add Alternate for two new picnic shelters, described below. The rest area is served by the following utilities: Electric power is provided by San Luis Valley Rural Electric Cooperative (SLVREC) currently via two separate single-phase services / meters. As part of this contract, the services will be combined and upgraded to a new 600A 3- Phase service with new transformer and conductors. A new Water well will be drilled by CDOT under a separate contract. All piping from the well, fittings, connections and wiring required for the water supply system is included in this contract. Water quality filtering equipment will be installed by others if required. For sanitary sewer, a new septic system will be installed as part of this contract. Question Deadline 03/19/2025 at 12:00 PM MT Questions are submitted online No, Point of Contact/Clarification Name: Robert L. Wilson Agency: Colorado Department of Transportation (CDOT) Phone: 303-548-6819 Email: Robert.L.Wilson@state.co.us Anticipated Notice to Proceed 04/19/2025 Anticipated Substantial Completion (270 days) 01/14/2026 Anticipated Final Acceptance (44 days) 02/27/2026 Addendum #1-#2 have been issued as of 3-14-2025.

Bid Results

Playgrounds / Parks / Athletic Fields

$49,830.00

Public - State/Provincial

New Construction, Paving, Site Work

75

30

10

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
2
Bidding Soon
124
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 19, 2025

Project location map

25313 US-160, South Fork, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.