Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 10, 2025 at 8:00 PM
Updated March 13, 2025
Renovation of a municipal facility in Lincoln, Massachusetts. Completed plans call for the renovation of a municipal facility.
Repair Personnel Doors in Buildings 13,15,19,45,46 (104th Civil Engineering, Westfield, MA) Project will include the repair of personnel doors in multiple buildings and replacement of panic doors, outside levers, hinges, and replacement of key cylinders if needed. Contractors with questions can submit them via email to the purchaser, Contract Specialist III Nick Haddad Nicholas.Haddad@mass.gov. Responses to questions will come in the form of an addendum, posted in the CommBuys solicitation prior to the bid closing date. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Repair Personnel Doors of building #13 (2 doors), building #15 (8 doors), building #19 (2 doors), building #45 (2 doors), and building #46 (1 door). Existing connected electronics, Advantor security system, is on the various parts of the door and will need to be re-installed/connected and tested after items are replaced The following items to be replaced on each door: 2.1.1 Items Von Duprin QEL98L-NL-03 3 US28 RHR or QEL98L-NL-03 3 US28 LHR kit, or equal, is compatible with current door and security system, for the panic bar, outside level, and escutcheon. 2.1.2 Replace Panic Bar Provide in accordance with Conventional Push Rail Exit Devices (Heavy Duty): ANSI/BHMA A156.3, Grade 1 Certified Products Directory (CPD) listed panic and fire exit hardware devices furnished in the functions specified in the Hardware Sets. Exit device latch to be stainless steel, pullman type, with deadlock feature. 2.1.3 Replace Outside Lever, compatible with panic bar. 2.1.4 Replace hinges. Provide in accordance with ANSI/BHMA A156.1, compatible with existing door 2.1.4.1 Hinges shall be of a continuous gear type for all doors specified for the repair, roton fire rated model 780-057 HD or equal. 2.1.5 Replace Key Cylinder (match existing) if needed. Current cylinders are in good condition and should be able to be reused. 2.1.5.1 If required, existing Cylinder is Best Locks. 2.2 Any removed/replaced part to be disposed off base by contractor. 2.3 New panic bars must be able to be used with existing base security system where required. 2.4 Contractor to schedule work previous coordination with military personnel for Weather and mission availability.
Post-Bid
Municipal
$70,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2025
April 1, 2025
Multiple Locations, Lincoln, MA
Related To This Project
Lincoln, MA
Bid Date: Mar 06 2025
Lincoln, MA
Bid Date: May 29 2025
Lincoln, MA
Bid Date: May 21 2025
Lincoln, MA
Bid Date: Mar 27 2025
Lincoln, MA
--
Lincoln, MA
Bid Date: Apr 11 2025
Lincoln, MA
Bid Date: Mar 10 2025
Lincoln, MA
Bid Date: Feb 14 2025
Lincoln, MA
Bid Date: Feb 05 2025
Lincoln, MA
Bid Date: Jan 23 2025
Lincoln, MA
Bid Date: Jan 10 2025
Lincoln, MA
Bid Date: Jan 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
