Published January 6, 2026 at 7:00 PM
Updated January 7, 2026
Demolition, site work, paving and new construction of a mixed-use development in Lincoln, Massachusetts. Conceptual plans call for the construction of a fire / police facility; for site work for a fire / police facility; transportation facility; transportation facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; for the demolition of a one-story above grade service station / car wash facility; and service station / car wash facility.
The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement to determine interest, availability, and capability of Small and Large Business concerns for Construction of a new Fire Station, new Air Passenger Terminal (APT) and Demolition of Building 1721, Hanscom Air Force Base (AFB), Bedford, MA. The NAICS code for the work described below is 236220 with a size standard of $45M. The estimated cost range is between $25M to $100M. Construction will begin in the summer/fall of 2026 with an expected duration of approximately 30 months. The new Fire Station will be constructed at a different site on Hanscom AFB. It will be a single story, 26,325 square foot (SF), fully functional facility. The program includes apparatus bays for six vehicles, living quarters, and administration spaces. Proposed construction will consist of a concrete foundation, reinforced floor slabs, steel framing and masonry walls, HVAC, central fire alarm, Emergency Communications Center with Fire and Security Forces Dispatch, paving, and landscaping. The Air Passenger Terminal building will be constructed north of existing Building 1721 and will be a single story 5,150 SF facility. The Air Passenger Terminal will include the safety offices, Distinguished Visitors lounge, pavement for building access and turnaround, as well as sidewalks. The existing flightline perimeter fence will be re-routed to the new Air Passenger Terminal building location. Building 1721, to be demolished, is an existing multi-story, 21,270 SF, facility that houses the existing fire station, safety offices, air passenger terminal, and Distinguished Visitor lounge. Building 1721 will remain operational until the two new buildings have been completed and the tenants have moved into their new respective buildings. Building 1639 is an existing, 4,241 SF, single story abandoned gas station. Please provide feedback as specified below. As of January 76, 2026, award date expected in July 2026. No further details at this time. Experience. Please provide up to five examples of projects substantially completed within the last five years in which you have demonstrated the following construction capability and identify your role in the project(s): Experience as the General Contractor on a construction contract over $30M. Indicate the scope of the effort, the size of the building, the contract amount for which your firm was responsible, and the construction start and completion dates. Experience managing and scheduling subcontractors. Indicate the scope of the effort, the subcontract work involved and the contract amount for which your firm was responsible. Experience with new major building construction. Indicate the scope of the effort, what your firm was responsible for and the contract amount for which your firm was responsible. If work is intended to be done using a team, please indicate this and include information on the major subconsultant(s) on the team in the information requested above. Solicitation Method. Provide your opinion on each of the following methods of procurement for this project: Request for Proposal/Best Value procurement, evaluated on technical factors and cost, awarded to the offeror demonstrating the best value; Invitation for Bid with a pre-qualifier, with the pre-qualifier as a pass-fail item and award to the low bidder that passes the pre-qualifier; and Invitation for Bid without a pre-qualifier, with award to the low bidder. Please answer the following regarding the above procurement methods: What is your preferred choice and why What do you see are the benefits and detriments to each Of the three strategies, are there any that you definitely would not submit on Please explain the reasoning. Share any other thoughts you have on the strategies. Consolidation. As stated above, the work anticipated under this contract includes constructing a new fire station, constructing a new air passenger terminal and demolishing Building 1721. Work will be executed in a phased approach. Building 1721 will be occupied, and therefore the building must be operational and accessible while construction of the new facilities is underway. After construction of both the Fire Station and the APT has been completed and accepted, the tenants will then occupy the new buildings and then Building 1721 can be demolished. Additionally, demolition of Building 1639, an existing, single story abandoned gas station, is anticipated to be procured separately under the small business MATOC contract. Refer to Figures 1 and 2 for preliminary layouts. The results of this market research will be taken into consideration during the Government's determination to consolidate this work. Please describe how consolidating this work into one project will affect the offer's ability to do the work, either positively or negatively. Interested firms should submit a response to this notice to include a discussion of the potential consolidation. Responses are due by Thursday, March 13, 2025, at 1:00 pm Eastern Time. Responses should be emailed to Contract Specialist Elizabeth Glasgow at Elizabeth.K.Glasgow@usace.army.mil. The Government will not pay for any material provided in response to this market research nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be in effect for a period of one year from the date of this notice. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Fire / Police
$100,000,000.00
Public - Federal
Demolition, New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2026
Multiple Locations, Lincoln, MA
Related To This Project
Lincoln, MA
Bid Date: Mar 10 2025
Lincoln, MA
Bid Date: Mar 12 2025
Lincoln, MA
Bid Date: Mar 06 2025
Lincoln, MA
Bid Date: May 29 2025
Lincoln, MA
Bid Date: May 21 2025
Lincoln, MA
Bid Date: Mar 27 2025
Lincoln, MA
--
Lincoln, MA
Bid Date: Feb 14 2025
Lincoln, MA
Bid Date: Feb 05 2025
Lincoln, MA
Bid Date: Jan 23 2025
Lincoln, MA
Bid Date: Jan 10 2025
Lincoln, MA
Bid Date: Jan 17 2025
Lincoln, MA
Bid Date: Jan 22 2025
Lincoln, MA
Bid Date: Dec 16 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.