BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2025 at 8:00 PM

Updated April 2, 2025

Renovation of a mixed-use development in Burlingame, California. Working plans call for the renovation of a library.

The City of Burlingame is seeking proposals from qualified Consultants to design and install Solar photovoltaic cells at existing City facilities (Project). Proposals shall be valid for 60 days from the proposal submittal date. The goal of this Project is to lower Citys energy dependance on non-renewable resources, and reduce energy consumption costs, thus align with City's commitment to sustainability and Citys Climate Action Plan. Solar PV Project includes engineering design, procurement of materials, permitting, construction, and commissioning of solar photovoltaic equipment for three of the following City's facilities (Project sites): 1. Corporation Yard (Corp Yard) 2. Library (Library) 3. Highland Garage (Garage) Online Q&A Yes Q&A Deadline 03/05/2025 2:00 PM (PST) For all the above-mentioned facilities, the Consultant should provide turnkey services and should perform all the required coordination, structural evaluations, electrical evaluations, and construction related coordination. The designs should account for any future expansion of the solar charging capacity. Please note that these alternatives should not deviate from the allowable tolerance per the NEM2 and ECAA loan approvals. The details of the design should be submitted for City approval. In addition, the Consultant should apply for all the required permits including but not limited to City's permits and Peninsula Clean Energy (PCE) and/or PGE permits. PCE is the distributor of electricity to the City's electricity grid. The solar photovoltaic systems for these facilities must allow for energy generation and net metering where excess energy can be fed back into the grid, in accordance with California Public Utilities Commission (CPUC) regulations. Integration of EV charging shall comply with all the applicable standards per California Green Building Standards Code, California Building Standards Code, CEC, and other local jurisdictions requirements. Shortlist confirmed

Final Planning

Solar Power Generation

$200,000.00

Public - City

Renovation

1

5

5

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
8
Bidding Soon
1,513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

March 12, 2026

Project location map

1361 N Carolan Ave, Burlingame, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.