Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 2, 2025
Renovation of a mixed-use development in Burlingame, California. Working plans call for the renovation of a library.
The City of Burlingame is seeking proposals from qualified Consultants to design and install Solar photovoltaic cells at existing City facilities (Project). Proposals shall be valid for 60 days from the proposal submittal date. The goal of this Project is to lower Citys energy dependance on non-renewable resources, and reduce energy consumption costs, thus align with City's commitment to sustainability and Citys Climate Action Plan. Solar PV Project includes engineering design, procurement of materials, permitting, construction, and commissioning of solar photovoltaic equipment for three of the following City's facilities (Project sites): 1. Corporation Yard (Corp Yard) 2. Library (Library) 3. Highland Garage (Garage) Online Q&A Yes Q&A Deadline 03/05/2025 2:00 PM (PST) For all the above-mentioned facilities, the Consultant should provide turnkey services and should perform all the required coordination, structural evaluations, electrical evaluations, and construction related coordination. The designs should account for any future expansion of the solar charging capacity. Please note that these alternatives should not deviate from the allowable tolerance per the NEM2 and ECAA loan approvals. The details of the design should be submitted for City approval. In addition, the Consultant should apply for all the required permits including but not limited to City's permits and Peninsula Clean Energy (PCE) and/or PGE permits. PCE is the distributor of electricity to the City's electricity grid. The solar photovoltaic systems for these facilities must allow for energy generation and net metering where excess energy can be fed back into the grid, in accordance with California Public Utilities Commission (CPUC) regulations. Integration of EV charging shall comply with all the applicable standards per California Green Building Standards Code, California Building Standards Code, CEC, and other local jurisdictions requirements. Shortlist confirmed
Final Planning
Solar Power Generation
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2025
March 12, 2026
1361 N Carolan Ave, Burlingame, CA
Related To This Project
Burlingame, CA
Bid Date: Mar 25 2025
Burlingame, CA
Bid Date: Mar 25 2025
Burlingame, CA
Bid Date: Apr 09 2025
Burlingame, CA
Bid Date: Apr 15 2025
Burlingame, CA
Bid Date: Apr 29 2025
Burlingame, CA
Bid Date: May 06 2025
Burlingame, CA
Bid Date: May 20 2025
Burlingame, CA
--
Burlingame, CA
Bid Date: Mar 18 2025
Burlingame, CA
Bid Date: Mar 06 2025
Burlingame, CA
Bid Date: Feb 20 2025
Burlingame, CA
Bid Date: Feb 18 2025
Burlingame, CA
Bid Date: Jan 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
