Site work for a power facility in Vidalia, Louisiana. Completed plans call for site work for a power facility.
115kv Transmission Line Logan Sewell Substation to Industrial Park Substation. The Project consists of constructing 3.0 miles of steel pole, 115kV transmission line. The transmission line construction will require the installation of 27 steel structures. Each pole will utilize a vibratory-installed steel caisson foundation. The new line will terminate on each end in an existing substation owned by the Town of Vidalia. All bids must be submitted on the proper form. The contractor must include his contractor's license number on the Bid. Any Electronic bid received after this time will not be considered. These items include but are not limited to the Bid Form and Corporate Resolution. Regardless of the bid results, the bidder will have 48 hours from opening of the bids to provide the original bid documents. If a bidder fails to provide the original hard copies of these documents within 48 hours of the bid opening, their bid shall be considered nonresponsive. The Town of Vidalia and the Engineer will not be responsible if the bidder cannot complete and submit a bid due to failure or incomplete delivery of the files submitted via the internet. Original bid documents shall be addressed to the Engineer located at 6885 Hwy. 84, Ferriday, LA 71334 and must be received 48 hours after bid opening, if not, the bid will be considered nonresponsive. Contractors are responsible for reproduction/printing of Bidding Documents. Contractors desiring to bid shall provide evidence that they hold a State License of proper classification and in full force and effect. For contractor information, this project is classified as Electrical Work. In accordance with RS 38:2212 G(2) plans and specifications shall be available to bidders until twenty-four hours before bid opening date. The Corporate Resolution must be signed and sealed. The Owner cannot waive any informalities on the bid form. The Owner reserves the right to reject any and all bids for just cause; such actions will be in accordance with title 38 of the Louisiana Revised Statutes. Each bidder must deposit with his/her bid, security in the amount, form, and subject to the conditions provided in the Instructions to Bidders. Bid bonds shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A-rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to ten percent of policyholders' surplus as shown in the A.M. Best's Key rating Guide or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana Residents. The contractor may withdraw a bid by affidavit within 48 hours of the bid opening in accordance with LA R.S. 382214.C; for patently obvious, unintentional and substantial mechanical, clerical or mathematical errors. The Bids will remain subject to acceptance for Sixty (60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner. Any interpretation of the bid documents shall be in writing addressed to Bryant Hammett & Associates, L.L.C. at 6885 Hwy. 84 West, Ferriday, LA 71334 or emailed to medwards@bhaengineers.com and to be given consideration must be received at least ten days prior to the date fixed for the opening of bids. No communication after this date. The Contractor shall begin mobilization and procurement of materials within ten (10) working days of the receipt of the Notice to Proceed. The successful bidder will be required to execute the Owner's Standard Form of Agreement/Contract for construction together with the Performance and Payment Bonds within ten (10) working days after issuance of the Notice of Award. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of Treasury Circular 570. The Owner hereby notifies all offerors that in regard to any contract entered into pursuant to this advertisement, that Minority Business Enterprises will be afforded equal opportunity to submit offers in response to this invitation and will not be discriminated against on the grounds of race, color, sex, national origin or disability in consideration for an award. The Project consists of constructing 3.0 miles of steel pole and a 115kV transmission line. The transmission line construction will require the installation of 27 steel structures. Each pole will utilize a vibratory-installed steel caisson foundation. The new line will terminate at each end at an existing substation owned by the Town of Vidalia. These specifications are intended to provide the necessary items and instructions to complete the improvements included in this project. The omission of items or instructions necessary or considered standard good practice for the proper installation and construction shall not relieve the Contractor of furnishing and installing such items to complete all improvements.
Award
Power Plant
$1,996,971.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
To Be Determined, Vidalia, LA
Related To This Project
Vidalia, LA
Bid Date: Mar 06 2025
Vidalia, LA
Bid Date: Apr 22 2025
Vidalia, LA
Bid Date: Jun 16 2025
Vidalia, LA
--
Vidalia, LA
Bid Date: Jul 21 2025
Vidalia, LA
Bid Date: Sep 30 2025
Vidalia, LA
Bid Date: Nov 13 2025
Vidalia, LA
Bid Date: Oct 27 2025
Vidalia, LA
Bid Date: Oct 24 2024
Vidalia, LA
Bid Date: Sep 06 2024
Vidalia, LA
Bid Date: Jun 27 2024
Vidalia, LA
Bid Date: Jun 21 2024
Vidalia, LA
Bid Date: May 21 2024
Vidalia, LA
Bid Date: Jul 02 2024
Vidalia, LA
Bid Date: Apr 25 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.