BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2025 at 8:00 PM

Updated June 19, 2025

Site work and paving for a transportation facility in Vidalia, Louisiana. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

for furnishing all labor, materials and equipment and performing all work necessary to complete: Schedule I Seal Coat and Crack Seal Runway 14-32 and Taxiway "A" Schedule II Seal Coat and Crack Seal T-Hangar Taxi Lanes Schedule III Seal Coat and Crack Seal Southern Aprons Schedule I - Seal Coat and Crack Seal Runway 14-32 and Taxiway "A" This schedule is to seal coat (P-209) and crack seal (P-605) Runway 14-32 and the partial parallel taxiway. The existing pavement markings will need to be removed at least 85%. The taxiway has solar reflectors attached to the pavement. These will need to be "taped off" prior to seal coat operations. The new marking will go back down will match existing except we will not be reinstalling the double yellow side stripe along the edge of the taxiway. The runway will be closed while working in the Runway Safety Area. Schedule II - Seal Coat and Crack Seal T-Hangar Taxi Lanes This schedule is to seal coat (P-209) and crack seal (P-605) Runway 14-32 and the partial parallel taxiway. The existing pavement markings will need to be removed at least 85%. Schedule III - Seal Coat and Crack Seal Southern Aprons This schedule is to seal coat (P-209) and crack seal (P-605) Runway 14- 32 and the partial parallel taxiway. The existing pavement markings will need to be removed at least 85%. Contract Work Items: This project will involve, but not be limited to, the following work items: Seal Coat, Joint/Crack Sealant and Pavement Marking. The correct rate is 9.64%. Goals for minority participation for each trade: 30.3% Goals for female participation in each trade: 6.9% Contract time requirements: 20 working days for Schedule I and 5 working days each for Schedules II and III.

Bid Results

Transportation Terminals

$260,320.00

Public - County

Paving, Site Work

16

9

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
52
Bidding Soon
456
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

August 1, 2025

Project location map

359 National Guard Rd, Vidalia, LA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.