EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Site work for a civil project in Pasadena, California. Completed plans call for site work for a road / highway.

This project consists of Transit Signal Priority (TSP) System along four corridors including the Fiber Optic Communications. The project corridors are: Lake Avenue between California Boulevard and Rio Grande Street California Boulevard between Arroyo Parkway and Lake Avenue Arroyo Parkway between California Boulevard and Glenarm Street Raymond Avenue between Glenarm Street and Walnut Street Foothill Boulevard between Altadena Drive and Halstead Street The project consists of installing the following: Transit Signal Priority (TSP) System - Ethernet switches with SFPs, IoT Gateway device, cell modem, various cables, din rail, and miscellaneous appurtenant work. Fiber Optic Communications - conduit, pull boxes, fiber optic equipment, fiber optic cables, CCTV cameras, video detection system, APS, Type 332 signal cabinets and foundations, and miscellaneous appurtenant work. The work includes the furnishing and installation of City standard sidewalks, and miscellaneous appurtenant work. Electronic Bid bond is required. Bidders must provide all required information for the City to verify the bond with their bid. The bond must meet the following requirements and characteristics: Bid security in the amount of five-percent (5%) of the total bid price in the form of a redeemable or callable electronic surety bond, meeting City requirements, must accompany all bids. The Material and Labor Bond and the Faithful Performance Bond shall be for one-hundred percent (100%) of the contract amount consisting of the base bid stated in the Bidder's Proposal. In accordance with Section 6-9 of the Standard Specifications, for each consecutive calendar day required to complete the work in excess of the time specified herein for its completion, as adjusted in accordance with Section 6-6 of the Standard Specifications, the Contractor shall pay to the City, or have withheld from monies due it, the sum of $3,600 per calendar day. Time is of the essence in the performance of the work. The CONTRACTOR shall begin work within fifteen (15) calendar days after date of the Notice to Proceed and shall diligently prosecute the work to completion in every detail, within 80 working days Working Days after the date in the Notice to Proceed with Work, exclusive of maintenance periods if any. Question Deadline 03/11/2025 at 2:00 PM PT Questions must be submitted via electronically. Range is $650,000 to $750,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$726,974.00

Public - City

Site Work

55

12

3

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
114
Bidding Soon
2,135
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

img_map_placeholder

Multiple Locations, Pasadena, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.