BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and paving for a mixed-use development in Fortville, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Title: Town of Fortville Mt. Vernon Trail: Phase 4-6 & Broadway Street & Madison Street Intersection Improvement Project, Broadway Street from South High Street/Madison Street to Flint Boulevard and E. Ohio Street/CR 1050 from Broadway Street to North Marble Way (Des # 2500071) in the Greenfield District. Contact for Questions: Joe Renner 714 E. Broadway Street Fortville IN, 46040 (317) 482-4049 jrenner@fortville.in.gov Local Public Agency: Town of Fortville Project Location: US 36 (Broadway Street) and E Ohio Street/CR 1050 Project Description: Phase 4 - The proposed phase will expand the Mt. Vernon Trial System through the construction of a 10 ft. wide, multi-use path from South High Street/Madison Street (SR 13) to the south side of Ohio Street/CR 1050 along US 36 (Broadway Street) Phase 5 - The proposed phase will expand the Mt. Vernon Trail System through the construction of a 10 ft. wide, multi-use asphalt path from US 36 to N. Marble Way along the south side of Ohio Street/CR 1050 Phase 6 - The proposed phase will expand the Mt. Vernon Trail System through the construction of a 10 ft. wide, multi-use asphalt path from Ohio Street/CR1050 along US 36 (Broadway Street) to Flint Boulevard Intersection Improvement - US 36 (Broadway Street) @ SR 13 (Madison Street) intersection. 0.04 miles west of SR 13 (Madison Street) to east side of SR 13 (Madison Street) and New Terrain South Madison Street (SR 13) approach to US 36 (Broadway Street) @ SR 13 (Madison Street). And signalized intersection improvements for pedestrians, bicycles, and vehicles. Additional details on specific scoping items in the MPO required Scope of Work. INDOT Des #: 2500071 Phases Included: PE Estimated Construction Amount: $5,890,000 Funding: Federal Funding involved Term of Contract: Until Project Completion DBE goal: 7% The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Mt. Vernon Trail: Phase 4-6 & Broadway Street & Madison Street Intersection Improvement Project

Conceptual

Roads / Highways

$5,890,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
176
Bidding Soon
1,752
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

Project location map

E Broadway St & E Ohio St, Fortville, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.