Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2025 at 8:00 PM
Updated April 11, 2025
Site work for a playground / park / athletic field in Rock Spring, Georgia. Completed plans call for site work for a playground / park / athletic field.
Contractors to provide all necessary service and materials for the construction of two (2) new pickleball courts totaling sixty feet in length by sixty-four feet in width (60' x 64') at Walker Rocks Park on the Walker County Civic Center Campus, 10052 Hwy 27, Rock Spring, Georgia WCG plans to construct two (2) new pickleball courts totaling 60' x 64' for the enjoyment of residents. To construct two (2) new pickleball courts measuring sixty by sixty-four feet (60' x 64') total Inquiries regarding this project and the bidding process should be sent by email to: j.legge@walkerga.us. Only inquiries received in writing will receive a response. All such written inquiries must be submitted by March 12, 2025 at 9:00 a.m. EDT SCOPE OF SERVICES a. OBJECTIVE: To construct two (2) new pickleball courts measuring sixty by sixty-four feet (60' x 64') total b. EXAMINATION OF SITE SPECIFICATIONS: Before submitting a proposal, each company shall: i. Examine the specifications and scope of work thoroughly ii. Familiarize themselves with all local laws, ordinances, rules and regulations affecting the performance of the work. c. SPECIFICATIONS: Construct two (2) new pickleball courts totaling sixty by sixty-four feet (60' x 64'). The construction of the courts shall include, but is not limited to: i. Haul and place 4" of crusher run with laser grader. ii. Roll crusher run when moist until compacted. Test to verify proper compaction. iii. Apply 2" of fine topping asphalt. iv. Install 4' high black vinyl coated fence with 9-gauge wire, 3" terminal posts, 2 1/2 " line posts, gates (wide enough for wheelchair access) and hardware as necessary around perimeter of the courts. v. Install 4 net foundations. vi. Flood courts with water to check for planarity and to identify low areas (birdbaths) and correct as needed according to USA Pickleball specifications. vii. Apply 2 coats of black and 2 coats of ACRYTECH colored full acrylic playing surface (color selected by owner). viii. Stripe two pickle ball courts with one coat of primer and two coats of texturized white line paint. ix. Install new net posts, new pickleball nets and center straps. d. TIMELINE: The project must be completed no later than September 30, 2025, unless the parties agree to an extension of time. ADDITIONAL ITEMS TO INCLUDE IN PRICING AS OPTIONS: a. OPTION 1: i. Build four (4) new pickleball courts (120' x 64') with the same specifications and amenities as above. Under this option, the surface would be configured for four courts INSTEAD of two courts. ii. Lighting for (4) new pickleball courts (see option #2) b. OPTION 2: i. Install a 2-pole/4-fixture 560-watt SCIMITAR or comparable LED lighting system. c. OPTION 3: i. Install a 4-pole/8-fixture 560-watt SCIMITAR or comparable LED lighting system
Award
Playgrounds / Parks / Athletic Fields
$143,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2025
April 23, 2025
10052 US-27, Rock Spring, GA
Related To This Project
Rock Spring, GA
Bid Date: Apr 17 2025
Rock Spring, GA
Bid Date: Apr 02 2025
Rock Spring, GA
Bid Date: Sep 17 2025
Rock Spring, GA
Bid Date: Dec 03 2025
Rock Spring, GA
Bid Date: Sep 15 2025
Rock Spring, GA
Bid Date: Jun 11 2021
Rock Spring, GA
Bid Date: May 28 2021
Rock Spring, GA
Bid Date: Dec 23 2020
Rock Spring, GA
Bid Date: Feb 13 2025
Rock Spring, GA
Bid Date: Oct 05 2023
Rock Spring, GA
Bid Date: Mar 30 2022
Rock Spring, GA
Bid Date: Mar 17 2023
Rock Spring, GA
Bid Date: Feb 14 2023
Rock Spring, GA
Bid Date: Jun 09 2022
Rock Spring, GA
Bid Date: Jun 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
