Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 22, 2025 at 8:00 PM
Updated April 23, 2025
Site work and paving for a civil project in Sharon, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
Pavement Resurface and Rehabilitation, Erosion Control - Temporary, Traffic Control, Street/Road Pavement Marking, Landscaping - Seeding, Street/Roadway Reconstruction , Paving (Highway, Road or Street) Woodland Road STH 66 to County Line Drive (4.3 mi) The Work shall be completed by October 17, 2025. Items of work include traffic control, common excavation, breaker run, geogrid, base aggregate dense 1 1/4-inch, culvert replacements, signing, HMA pavement, base aggregate dense 3/4-inch for shouldering, and landscape restoration. Following is a list of approximate quantities for some of the main items: 18,000 CY Excavation Common 2,200 Tons Base Aggregate Dense 3/4-Inch 21,700 Tons Base Aggregate Dense 1 1/4-Inch 5,500 Tons Breaker Run 8,250 Tons HMA Pavement 8,200 SY Geogrid SR No bid shall be considered which is not completed on the online website and no late bids shall be accepted. No bid shall be considered unless accompanied by a bid bond equal to 5 percent (5%) of the total bid price payable to said Town of Sharon as a guarantee that if the bid is accepted, the bidder will execute and file a contract within ten (10) days after award. Est. Completion Date: Oct. 17, 2025 For bidding questions, or for additional information, contact the Town's engineer at (715) 341-4363. Question Deadline 03/07/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than three days prior to the date for opening of Bids may not be answered. The contractor has made a proposal in writing to the OWNER to furnish the material, equipment, labor and everything necessary for the completion of the work herein, for the unit prices and within the time specified in the Contract Documents and according to the Contract Documents therefore on file in the Town of Sharon and the Town has awarded the work to the Contractor according to law.
Bid Results
Roads / Highways
$1,430,542.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2025
April 9, 2025
Woodland Rd, Sharon, WI
Related To This Project
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Oct 03 2024
Sharon, WI
--
Sharon, WI
--
Sharon, WI
Bid Date: Jun 11 2024
Sharon, WI
Bid Date: May 14 2024
Sharon, WI
Bid Date: Mar 07 2024
Sharon, WI
Bid Date: Mar 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
