BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Demolition, site work, renovation and addition to an educational facility in Beaverton, Oregon. Working plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of October 17, 2025, per owner, contractor has been identified, and the building permit was issued in May of this year. Pursuant to Section 50.40.4 of the Beaverton Development Code, public notice of the following development application is being provided:LU22024-00991Cooper Mountain ES Office Addition(CU22024-00989, DR12024-00990)The applicant, Beaverton School District, requests Minor Modification of a Conditional Use and Design Review Compliance Letter approval for the addition of approximately 980 square feet of floor area to the existing school. Additionally, 20 new landscape trees are proposed to be planted to mitigate the removal of one existing landscape tree. The site is located at 7670 SW 170th Avenue, specifically identified as Tax Lot 300 on Washington County Assessor’s Map1S119DD. It is zoned Residential Mixed B (RMB) and is with-in the boundaries of the Sexton Mountain NAC. Any decision on the above development proposal shall be based on the approval criteria contained in the Beaverton Development Code Section 40.03.1 Facilities Review, Section 40.15.15.2 Mi-nor Modification of a Conditional Use, and 40.20.15.1 Design Review Compliance Letter. NOTE: The Community Development Department is currently open to the public on a limited basis, Monday through Thursday from 8:30 a.m. to 4:30 p.m. Please note that the Community Development Department is not currently open to the public on Fridays. Staff recommends visitinghttps://www.beavertonoregon.gov/183/Community-Developmentfor the most up-to-date information about in-person and virtual services. Staff strongly encourages you to submit any testimony comments or questions via email to the Project Planner. Written comments on the above development proposal may also bemailed to the Current Planning Division, at PO Box 4755, Beaverton, OR 97076. Written comments, either emailed or mailed, on the above development proposal shall be received no laterthan 5:00 p.m. on Wednesday, March 12, 2025. Please refer-ence the Case File Number and Project Name in your written comments and include your mailing address if you wish to receive a copy of the decision. Failure to raise an issue or failureto provide statements or evidence with sufficient specificity toafford the decision-making authority an opportunity to respondto such issue, may preclude appeal to the Land Use Board ofAppeals on that issue.The Facilities Review Committee Meeting with the applicantwill be held March 12, 2025. The Facilities Review Committeeis not a decision-making body but advises the Director on aproject's conformity to the technical criteria specified in Section 40.03.1 of the Beaverton Development Code. The Facili-ties Review Committee meeting is open to the public but is notintended for public testimony.Public Comment Period Ends: March 12, 2025The Director is the decision-making authority for the aboveapplication and shall issue a written decision on the above de-velopment proposal on or around March 26, 2025, pursuant toSection 50.40.10. Copies of the decision will be made availableon the City’s website https://apps3.beavertonoregon.gov/DevelopmentProjectsand via the Beaverton Electronic PermittingSystem (BEPS) Public Portal https://prod.buildinginbeaverton.org/record-details/#intdetails/planning/intid/2985. The deci-sion may also be provided by the Project Planner upon request.For more information and to access plans and additional infor-mation on the application you can visit the project specific pageon the Beaverton Electronic Permitting System (BEPS) PublicPortal at the following link: https://prod.buildinginbeaverton.org/record-details/#intdetails/planning/intid/2985.For more information, contact the Project Planner, Steve Regn-er, at sregner@BeavertonOregon.gov or (503) 319-4427.Accessibility information:This information can be made avail-able in large print or audio tape upon request. Assistive listen-ing devices, sign language interpreters, or qualified bilingualinterpreters can be made available at any public meeting orprogram with 72 hours advance notice. To request these services, contact Steve Regner by calling 711 (503) 319-4427 oremail sregner@beavertonoregon.gov.Dated this February 20, 2025Jana Fox, Current Planning Manager, City of BeavertonPublish February 20, 2025TT351672 The applicant, Beaverton School District, requests Minor Modification of a Conditional Use and Design Review ComplianceLetter approval for the addition of approximately 980 squarefeet of floor area to the existing school. Additionally, 20 newlandscape trees are proposed to be planted to mitigate the removal of one existing landscape tree. The site is located at 7670 SW 170th Avenue, specifically identified as Tax Lot 300 on Washington County Assessor's Map1S119DD. It is zoned Residential Mixed B (RMB) and is within the boundaries of the Sexton Mountain NAC. Any decision on the above development proposal shall be basedon the approval criteria contained in theBeaverton DevelopmentCodeSection 40.03.1Facilities Review,Section 40.15.15.2 Minor Modification of a Conditional Use, and 40.20.15.1 DesignReview Compliance Letter. NOTE: The Community Development Department is currentlyopen to the public on a limited basis, Monday through Thursday from 8:30 a.m.to 4:30 p.m. Please note thatthe CommunityDevelopment Department is not currently open to the publicon Fridays. Staff recommends visiting website for the most up-to-dateinformation about in-person and virtual services. Please reference the Case File Number and Project Name in your writtencomments and include your mailing address if you wish to receive a copy of the decision. Failure to raise an issue or failureto provide statements or evidence with sufficient specificity toafford the decision-making authority an opportunity to respondto such issue, may preclude appeal to the Land Use Board ofAppeals on that issue. The Facilities Review Committee Meeting with the applicantwill be held March 12, 2025. The Facilities Review Committeeis not a decision-making body but advises the Director on aproject's conformity to the technical criteria specified in Section 40.03.1 of the Beaverton Development Code. The Facilities Review Committee meeting is open to the public but is notintended for public testimony. The Director is the decision-making authority for the aboveapplication and shall issue a written decision on the above development proposal on or around March 26, 2025, pursuant toSection 50.40.10. Copies of the decision will be made availableon the City's website. The decision may also be provided by the Project Planner upon request.For more information and to access plans and additional information on the application you can visit the project specific pageon the Beaverton Electronic Permitting System (BEPS) PublicPortal at the following website. For more information, contact the Project Planner, Steve Regner, at sregner@BeavertonOregon.gov or (503) 319-4427. Accessibility information: This information can be made available in large print or audio tape upon request. Assistive listening devices, sign language interpreters, or qualified bilingualinterpreters can be made available at any public meeting orprogram with 72 hours advance notice. To request these services, contact Steve Regner by calling 711 (503) 319-4427 oremail sregner@beavertonoregon.gov.

Pre-Construction/Negotiated

Educational

$1,695,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
47
Bidding Soon
1,043
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

July 1, 2026

Project location map

7670 SW 170th Ave, Beaverton, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.