Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Renovation of an educational facility in Charlotte, North Carolina. Completed plans call for the renovation of a educational facility.
Charlotte-Mecklenburg Board of Education reserves the unqualified right to reject any and all proposals. Roof replacement on Roof Areas A3 and A5 generally consists of removal and disposal of the existing gravel-surfaced built-up roofing system on Area A3, modified bitumen roofing system on Area A5 perlite insulation, polyisocyanurate insulation, flashings, metal coping caps, and associated work specified herein to the existing roof decks. Work includes furnishing and installation of a new 2-ply modified bitumen roofing system, gypsum cover board, tapered insulation crickets and saddles, polyisocyanurate insulation, flashings, metal coping caps, roof drains and associated work specified herein. After Contracts are fully executed, a Notice to Proceed will follow within sixty (60) calendar days. Actual physical work and mobilization is scheduled for Monday, June 9, 2025 and shall not occur prior to Saturday, June 7, 2025 . 1. Work related to submittals and planning may begin prior to June 9, 2025. Contractor's working hours are anticipated to be from 7:00 a.m. to 7:00 p.m. Monday to Friday. Weekend work is permitted if needed. Final Completion: August 9, 2025. If work extends beyond this date, contractor will be required to work after school hours, school breaks, or weekends to complete the project. Liquidated damages will apply starting the first calendar day after the date established for final completion and will be assessed at a rate of $250 per day for each calendar day, until such time as all construction is complete and has been accepted by the Engineer. Any questions regarding the project details should be addressed to Mr. Todd Smith of Terracon Consultants at Todd.Smith@terracon.com. Question Deadline 02/28/2025 Prospective bidders must request interpretation in writing from the Engineer.
Post-Bid
Educational
$600,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
June 9, 2025
5850 Statesville Rd, Charlotte, NC
Related To This Project
Charlotte, NC
Bid Date: Mar 12 2025
Charlotte, NC
Bid Date: Mar 04 2025
Charlotte, NC
Bid Date: Mar 07 2025
Charlotte, NC
--
Charlotte, NC
Bid Date: Mar 25 2025
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
Bid Date: Mar 13 2025
Charlotte, NC
Bid Date: Mar 11 2025
Charlotte, NC
Bid Date: Mar 17 2025
Charlotte, NC
Bid Date: May 08 2025
Charlotte, NC
Bid Date: Mar 19 2025
Charlotte, NC
Bid Date: Jul 29 2025
Charlotte, NC
Bid Date: Mar 11 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
