BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work and paving for a mixed-use development in Gillette, Wyoming. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Wagonwheel Elementary School Playground Improvements project Alternate 1 scope involves the playground north of the school facility, with the removal of 5665 SY of AC and PCC surfacing; replacement PCC surfacing of 5386 SY of heavy duty PCC paving; removal of 81 SF of PCC sidewalk and 63 SF PCC valley gutter; installation of 81 SF of PCC sidewalk; installation of 2754 SF of PCC valley gutter; associated base course and subgrade preparation; earthwork grading above subgrade, as well as values for remediation below subgrade to be field verified. Scope includes remove and replace storm drain and inlets, new storm drain and inlets; minor remove and replace chain link fencing, gates and components; multiple instances of existing PCC landscape wall adjustments; remove, strip finish, prepare, repaint, and reinstall playground equipment; remove landscaping and replace vegetation landscaping and sod. Scope includes existing parking lot and proposed playground pavement striping on the proposed playground, the existing parking lots to the south and east of the school facility, the west parking lot across Hemlock Avenue, and limited Hemlock Avenue striping to support student drop-off and crosswalks. Project Alternate 2 scope is largely identical with regard to improvements except work identifies the replacement surfacing of 5386 SY of heavy duty AC paving; associated base course and subgrade preparation; and minor differences in earthwork due to differing section depths. Each Bid must be accompanied by a Bid Bond payable to Campbell County School District for ten percent (10%) of the total amount of the Base Bid, (a certified check may be used in lieu of a Bid Bond) pledging that the Bidder will enter into a contract with Campbell Count School District on the terms stated in his Bid. The successful Bidder shall provide a 100% percent of the contract Performance and Payment Bond or a Letter of Credit or any other security as approved by Campbell County School District as stated in the Instructions to the Bidder. The Campbell County School District reserves the right to accept or reject any or all bids and to waive any irregularities or informalities in bidding.

Award

Playgrounds / Parks / Athletic Fields

$970,565.00

Public - City

Paving, Site Work

23

4

2

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
8
Bidding Soon
141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

May 27, 2025

Project location map

800 Hemlock Ave, Gillette, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.