EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Elgin, Illinois. Completed plans call for the renovation of a educational facility.

School District U-46 is currently accepting bids for the Roof Replacement at Coleman Elementary School Should you have any questions contact or School District U-46 Procurement Coordinator, Danise Smith at danisesmith@u-46.org. Question Deadline 03/07/2025 at 2:30 PM CT online submission. Scope of Work includes, but is not limited to the following: Removal and replacement of low slope roof systems, steep slope roof system and associated sheet metal work at Coleman Elementary School, as noted on the drawings and in the project manual. 1. All costs for overtime, weekend work, or additional manpower shall be included in the Base Bid, as required to meet the project schedule/timeline as outlined herein. 2. All work shall be under Prime Roofing Contractor. All demolition, architectural, mechanical, electrical, plumbing, and roofing work is a part of the Prime Roofing Contractors responsibility. 3. The Time Schedule for this work is very critical. When submitting a bid, the Prime Roofing Contractor agrees they can meet the completion requirements. The bidder agrees they have adequate staff and financial resources to complete the project on time. The bidder further agrees they have included any premium necessary to have workers on overtime, multiple working shifts, holidays, weekends or any other arrangement to adequately man the project to meet the schedule. The Prime Roofing Contractor further agrees they will place a Project Superintendent from his staff full time on the project. In addition, the Project Superintendent must be on site any time any subcontractors are on site. Failure to maintain a full time Project Superintendent on the site from start to final acceptance will be reason for the Owner to deduct from the contract amount all costs of services if the Owner and/or Architect decide any other services are required to complete the project in an orderly and timely manner

Post-Bid

Educational

$200,000.00

Public - County

Renovation

8

12

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
175
Bidding Soon
2,724
All Active Projects
1,204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

May 27, 2025

img_map_placeholder

1220 Dundee Ave, Elgin, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Roof Replacement at Coleman Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.