Published April 5, 2025 at 8:00 PM
Updated April 6, 2025
Site work for a power facility in Wright Patterson AFB, Ohio. Completed plans call for site work for a power facility.
UPDATE 17 MARCH 2025 - AMENDMENT 1 TO COMBO-AFRL-PZLEQ-2025-0100 (See Attached) This is a combined synopsis/solicitation for the RQ Building 65 Unit Substation Updates issued by the Air Force Research Laboratory, Wright-Patterson AFB, Ohio Place of Performance: Wright-Patterson AFB, Ohio Project: B65 Unit Substations The contractor shall replace the fan controller, 2x bolt on bus large breakers, 1x bolt on buss medium breaker, and 8x stab on breakers of various sizes in Substation 14. The contractor shall provide and install a new switchboard to replace Substation 12 main gear, Substation 12 480V distribution gear, Panel P, and Panel A4 in 115E. The contractor shall provide a new 2000A Feed to the new switchboard in Section 3.2 from an existing breaker in Substation 11. The contractor shall provide and install a new panelboard to replace existing 240V section of Substation 12 distribution gear in 115E. The contractor shall provide and install 2 new panelboards to replace Panel H, these new panelboards will be relocated within M103E, and all new feeds will be provided to branch circuits. The contractor shall provide and install a new panelboard to replace existing 480V PDP 480 TFE on the Test Floor, relocate an existing 480V panelboard, and provide and install a new 75KVA 480Y to 208Y transformer that will feed 2x 100A 208/120V Panelboards. The contractor shall provide and install a new panelboard to replace existing 480V PDP 480 1EW 2 in the East Warehouse. The contractor shall demolish existing gear that is no longer required in and around the locations of the new panels identified in Sections 3.2-3.7. The period of performance for this work is 18 months from time of award.
Post-Bid
Power Plant
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
June 4, 2025
To Be Determined, Wright Patterson AFB, OH
Related To This Project
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Apr 17 2025
Wright Patterson AFB, OH
Bid Date: May 06 2025
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Jun 26 2025
Wright Patterson AFB, OH
Bid Date: Sep 03 2025
Wright Patterson AFB, OH
Bid Date: Sep 12 2025
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Mar 04 2025
Wright Patterson AFB, OH
Bid Date: Mar 12 2025
Wright Patterson AFB, OH
Bid Date: Jan 02 2025
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Jan 29 2025
Wright Patterson AFB, OH
Bid Date: Feb 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.