Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2025 at 8:00 PM
Updated March 21, 2025
Site work and paving for a transportation facility in Fort Smith, Arkansas. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
THE PROJECT is planned to be constructed during the Spring months in 2025 and generally consists of the rehabilitation of the Runway 8 End Approach Blast Pad (200' length x 150' width) per FAA specifications, including, but not limited to, asphalt cold milling, tack coat, and asphalt overlay, among other related items of work. PROPOSALS shall be accompanied by a proposal guaranty in the form of a bid bond executed by a reliable Surety Company, or a certified or cashier's check drawn on a National Bank or a bank having membership in the Federal Reserve System. The proposal guaranty shall be in an amount not less than five percent (5.0%) of the total amount bid made payable without recourse to the Fort Smith Airport Commission as a guarantee that the Bidder will enter into a contract, including execution of payment and performance bonds, within ten (10) days after notice of award of a contract by the Owner. The successful bidder must furnish a payment and performance bond upon the form provided in an amount equal to one-hundred percent (100%) of the total contract price from an approved surety company licensed in the State of Arkansas to act as a surety, or other surety acceptable to the Owner. The Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth in Required Contract Provisions. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade: 5.6% Goals for female participation in each trade: 6.9%. These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. Any questions regarding bids are to be directed to Brian Maurer, P.E., Halff Associates, Inc., 5704 Euper Lane, Suite 200, Ft. Smith, Arkansas, by phone at (479) 485-5111 or by e-mail at bMaurer@halff.com. No Proposal may be withdrawn within ninety (90) calendar days after the date of opening of Proposals. The awarding of this contract work is contingent upon the Fort Smith Airport Commission's receipt of sufficient funding from the Federal Aviation Administration. The Fort Smith Airport Commission reserves the right to reject any or all bids, to waive technicalities/irregularities in the bids, except for those affecting Equal Employment Opportunity matters. Pre bid notes: Bidders who wish to observe the work area will have the option to participate in an escorted site visit after the meeting.
Bid Results
Transportation Terminals
$603,400.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 10, 2025
6700 McKennon Blvd, Fort Smith, AR
Related To This Project
Fort Smith, AR
Bid Date: Mar 12 2025
Fort Smith, AR
Bid Date: Mar 13 2025
Fort Smith, AR
Bid Date: Aug 29 2025
Fort Smith, AR
Bid Date: Mar 13 2025
Fort Smith, AR
--
Fort Smith, AR
Bid Date: Mar 07 2025
Fort Smith, AR
Bid Date: Mar 18 2025
Fort Smith, AR
Bid Date: Mar 11 2025
Fort Smith, AR
Bid Date: Mar 04 2025
Fort Smith, AR
--
Fort Smith, AR
Bid Date: Mar 07 2025
Fort Smith, AR
Bid Date: Feb 14 2025
Fort Smith, AR
Bid Date: Feb 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
