BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 26, 2025

Renovation of a playground / park / athletic field in Buffalo, New York. Completed plans call for the renovation of a playground / park / athletic field.

Buffalo Erie County Botanical Gardens Addition - BP-104 Mechanical Contractor Each proposal must be accompanied by a Bid Bond of five percent (5%) of the amount of the bid payable unconditionally to the Buffalo and Erie County Botanical Gardens. Project Description/General Overview: 2655 South Park Avenue, Buffalo, NY 14218 Project Site Work: o Demolition of existing trees, stumps, asphalt, etc. o New North Asphalt Roundabout & Concrete Entrance Walkway o Renovated Courtyard Space and Heavy-Duty Stone Dust Path o New South Parking Lot o New Concrete Wedding Pad and ADA Ramp o Fire Access Path o New Site Luminaires and Pole Bases Buffalo and Erie County Botanical Gardens 2/27/2025 Page 2 of 6 o New Exterior ACCU's and Associated Concrete Pads/Foundations o New Plantings by Owner Grow Range Building Renovations (2 floors): o Abatement of window/door caulk, flooring, and mud fittings o Demolition and removal of existing interior walls, MEP systems, doors, and staircases o Demolition and removal of existing roof & skylights o New metal stud walls with Gyp board o New Doors o Aluminum Doors by Window Contractor o Hollow metal, wood, FRP, and steel doors by General Contractor o New Plumbing Systems o Includes water heater, return pump, expansion tank, fixtures, etc. o New Fire Protection System (Dry & Wet) o New Mechanical System o Includes indoor split system air conditioning units, unit heaters, air handlers, finned tube, etc. o New Electrical Systems o Includes mechanical/plumbing equipment connections, main distribution panel, panelboards, transformer, Fire Alarm Panel, disconnects, etc. o P1 Greenhouse Renovations o See Alternates Section o ACT Ceiling System o Security Camera System by Owner o Electrical Contractor shall provide wire, conduit, and connection o Access Control System by Owner o Electrical Contractor shall provide wire, conduit, and connection New Building Addition (3 floors): o New Foundations o Excavation and backfill by Site Contractor o Concrete, reinforcing, and forming by General Contractor o Structural Components of building Addition by General Contractor o Glue Laminated Beams and Columns o Cross Laminated Timber decking o Steel beams o Concrete beams/walls o Fiber Cement Panel Siding o New metal stud walls with Gyp board o New Doors o Aluminum Doors by Window Contractor o Hollow metal, wood, and FRP doors by General Contractor o New Plumbing Systems o Includes water heater, return pump, expansion tank, fixtures, etc. o New Fire Protection System (Wet Only) o New Mechanical System o Includes unit heaters, air handlers, duct heaters, etc. o New Electrical Systems Buffalo and Erie County Botanical Gardens 2/27/2025 Page 3 of 6 o Includes mechanical/plumbing equipment connections, main distribution panel, panelboards, transformer, Fire Alarm Panel, disconnects, etc. o New Hydraulic Elevator o Elevator cab, lighting, components by General Contractor o Wire, Conduit, Connection to Elevator Control Panel by Electrical Contractor o Standing Seam Metal Roof o Aluminum Storefront Window Systems o Security Camera System by Owner o Electrical Contractor shall provide wire, conduit, and connection o Access Control System by Owner o Electrical Contractor shall provide wire, conduit, and connection o Open Ceilings B. Moisture Control Plan (Review 00 10 00 Exhibit G for more information) o The General Contractor will be responsible for removing water/snow off the CLT Decking at all times while its exposed. There shall be no standing water on the deck. o The General Contractor shall be responsible for temporary heating, dehumidification, and cooling of the new building Addition. The temporary climate of the new building addition shall conform with the Cross Laminated Timber (CLT) and Glue Laminated beams/columns/truss manufacturer's requirements The County of Erie reserves the right to reject any or all bids and waive any informality. Question Deadline 03/17/2025 at 12:00 PM ET All Pre-Bid questions shall be forwarded in writing via email: to Turner Construction Company, attention Sam Auria at sauria@tcco.com. *Please note that the BP-103 (Plumbing) is the only bid package being pushed to 4/1/25. All other bid packages bid opening date will remain 3/25/2025.**

Post-Bid

Playgrounds / Parks / Athletic Fields

$960,000.00

Public - County

Renovation

224

33

136

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
280
Bidding Soon
4,401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

June 9, 2025

Project location map

2655 South Park Ave, Buffalo, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.