BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Renovation of a mixed-use development in Fort Collins, Colorado. Completed plans call for the renovation of a educational facility.

Reference Number 0000377680 Job Location: Fort Collins, CO Facilities Management at Colorado State University is seeking firm, competitive documented quote responses from qualified Contractors for replacement of flooring and cove base in resident rooms and corridors in Newsom Hall Dormitory. Bid Intent Not Available Anticipated Contract Start Date May 19, 2025 Anticipated Contract Finish Date August 1, 2025 Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Labor and Materials Bond 50 % Question Deadline 03/20/2025 at 12:00 PM MT Questions are submitted online No, Vendors may submit questions by email to the Single Point of Contact prior to the Questions Due Date identified in the Basic Information and Timeline above. The Agency/Institution may answer some, all, or none of the questions asked by posting them publicly. Base Bid Scope of Work: Contractor will be responsible for providing all materials, equipment, labor, and services necessary to remove existing flooring/cove base and install new carpet tiles and cove base in 179 resident rooms noted on drawings. Add-Alternate # 1: Additional cost to remove existing flooring/cove base in 32 additional resident rooms, install LVT in lieu of carpet tiles in all 211 resident rooms, and install cove base in 32 additional rooms as noted in drawings. Add-Alternate # 2: Additional cost to remove existing flooring/cove base in basement landings and hallways. Install LVT, carpet tiles and cove base as noted in drawings AD1.6 & A3.6. See section F.17 "Method of Award" for more information on the award of alternates. For the purposes of this procurement, the sum total of funds available for award is: $320,000.00 Additional Scope Information: Please note, there will be multiple projects going on at the same time in Newsom Hall (including but not limited to: South resident wings abatement/roof replacement, South/North resident room and hallways lighting replacement, resident room door painting, drinking fountains replacement. The resident wings will not be occupied during this timeframe but there will need to be coordination and scheduling with these other projects. Access to the South resident wings will be at the end stair towers (fire towers) on East and West end of the resident wing Access to the North resident wing will be from the center section while the roof work is taking place.

Award

Educational

$168,194.00

Public - State/Provincial

Renovation

18

9

11

10

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
111
Bidding Soon
1,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 19, 2025

Project location map

700 W Pitkin St, Fort Collins, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.