BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work for a sidewalk / parking lot in Manitowoc, Wisconsin. Completed plans call for site work for a sidewalk / parking lot.

Est. Completion Date: Aug. 29, 2025 Description: This project consists of Retracing pavement markings with epoxy paint on Waldo Blvd. from Maritime Drive to Fleetwood Drive, new 6" & 12" crosswalks on Maritime Drive at Cleveland Ave., parking stalls on S. 8th St. and the relocation of the railroad crossing symbols on South 21st Street at Franklin Street. It is the intent of the City of Manitowoc have the Contractor prepare the existing road surface, apply epoxy pavement markings as shown on the plans and for all incidentals required for the completion of this project. Additional Description: A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty.

Bid Results

Sidewalks / Parking Lot

$131,615.00

Public - City

Site Work

11

5

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
60
Bidding Soon
803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

Project location map

Waldo Blvd, Manitowoc, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.