BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Site work and paving for a civil project in Crystal, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

2025 Bituminous Resurfacing Project The overall project includes curb and gutter repairs, sanitary and storm-water manhole adjustments, milling pavement down and repaving with new bituminous surface. Approximate Quantities: o 31,620 square yards of pavement to be milled down two inches and overlayed with new bituminous. o 520 lineal feet of curb and gutter replacement. o 35 sanitary manholes to have new castings installed and be adjusted to match the height of the new pavement. o 5 storm water manholes to be adjusted to match the height of the new pavement. Est. Completion Date: Sept. 30, 2025 Site Address: South Forest Neighborhood Site Directions: Mainly contained between: Louisiana Ave N (to the West), Douglas Dr N (to the East), 42nd Ave N (to the South) and 45th Ave N (to the North). Also includes part of the Community Center Parking Lot at 4800 Douglas Dr N.

Bid Results

Water / Sewer

$456,151.00

Public - City

Paving, Site Work

13

6

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
125
Bidding Soon
1,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

April 11, 2025

Project location map

Multiple Locations, Crystal, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.