Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 26, 2025 at 8:00 PM
Updated August 2, 2025
Renovation of an educational facility in Greensboro, North Carolina. Completed plans call for the renovation of a 41,631-square-foot educational facility.
The Moore Building has not seen a significant renovation since it was constructed in 1969. Spanning 23,502 assignable square feet (41,631 GSF), the building has served as a hub for academic activity, previously housing the Nursing program alongside general-purpose classrooms. The purpose of this project is to transform the Moore Building into a state-of-the-art facility that supports interdisciplinary collaboration, program growth, and academic excellence. This project is a comprehensive, transformational renovation, including new plumbing, mechanical, electrical, sprinkler and fire alarm systems; roof and window replacement; and accessibility and site improvements to enhance the building's use and future sustainability. Interior demolition and abatement will occur as necessary to ensure the Moore Building functions as a "new" facility while maximizing space for academic and institutional purposes. During the project's development, LEED certification will be evaluated and considered. The renovation will plan to house Health and Human Services (HHS) programs, including advising and dedicated space for a proposed Doctor of Occupational Therapy program with instructional lab, offices, and flexible support spaces. Existing classroom spaces will be retained and modernized where feasible, including a ground-level 160-person auditorium and two second-floor classrooms with fixed seating. Remaining ASF will be evaluated during programming for alteration and renovation for possible change-in-use and future flexibility to align with evolving program needs.
Post-Bid
Educational
$24,200,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
April 1, 2026
1400 Spring Garden St, Greensboro, NC
Related To This Project
Greensboro, NC
Bid Date: Mar 12 2025
Greensboro, NC
Bid Date: Mar 18 2025
Greensboro, NC
--
Greensboro, NC
Bid Date: Mar 21 2025
Greensboro, NC
Bid Date: Mar 18 2025
Greensboro, NC
Bid Date: Mar 13 2025
Greensboro, NC
Bid Date: May 01 2025
Greensboro, NC
Bid Date: Mar 14 2025
Greensboro, NC
Bid Date: Mar 24 2025
Greensboro, NC
Bid Date: Mar 20 2025
Greensboro, NC
Bid Date: Mar 19 2025
Greensboro, NC
Bid Date: Mar 26 2025
Greensboro, NC
Bid Date: Mar 12 2025
Greensboro, NC
Bid Date: Sep 18 2025
Greensboro, NC
Bid Date: Mar 20 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed