BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Renovation of an educational facility in Sumter, South Carolina. Completed plans call for the renovation of a educational facility.

**Per Addendum 2 the bid date has been extended from 03/27/25 to 04/01/25** Remove air handling unit and existing hot and chilled water piping, and installation of roof top package heat pump, to include electrical connections, new ceiling diffusers, ceiling systems, gypsum wall patching, floor patching, structural support and roofing. Small and Minority Business participation is highly encouraged. *The value for this project is based on a financial range $300,00 0 to $350,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work of Project is defined by the Contract Documents and consists of the following: 1. Removal of existing air handling unit and installation of new roof top heat pump. 2. Selective demolition of portions of the existing HVAC system including existing piping and ceilings. Note that asbestos abatement shall be performed under Student Union, Replace RTU-2 and Upgrade HVAC separate contract and this contractor shall be responsible for coordinating schedule and work activities with the abatement contractor. 3. New acoustical lay-in ceilings, concrete floor patching, gypsum board wall patching, new vinyl floor tiles, structural steel framing for RTU support, and roofing. 4. All power and control wiring. Control wiring shall be 120 volts or less. 5. Test and balance of existing HVAC systems in the building, and modification of existing roof top units to disable economizer sequence. 6. Control Management, Inc. is the only approved control vendor for this project. No other control contractors shall be approved. BASE BID: Work to include but not limited to, removal of existing air handler, and installation of new roof top package heat pump system. The contractor is responsible for any required temporary removal and reinstallation of existing ceiling grid as required to complete the mechanical work, installation of new ceilings, new gypsum board walls, flooring and concrete floor patching. The contractor is responsible for structural support modifications for roof top condensing unit and roofing work to flash roof curb.

Award

Educational

$310,780.00

Public - State/Provincial

Renovation

12

10

6

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
58
Bidding Soon
1,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

April 28, 2025

Project location map

200 Miller Rd, Sumter, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.