BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 15, 2025

Site work and paving for a mixed-use development in Moraine, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 9, 2025 project is not yet been awarded. 2025 CURB, ROAD, AND STORM STRUCTURE IMPROVEMENTS PROGRAM - this work consists of concrete maintenance/replacement of curbs, roads, and storm structures throughout the city of moraine. SAW CUT WIDTH SHALL ALLOW SPACE REQUIRED TO FORM, BACKFILL, AND MECHANICALLY COMPACT RESTORED AREA IF NOT USING LSM RESTORATION SAW CUT EXISTING PAVEMENT (FULL (JJ DEPTH) 3"-12" IN FRONT OF CONCRETE CURB.* CURB AND GUTTER REMOVED, AGGREGATE BASE, 4" MIN,CURB, MATCH EXISTING TYPE NO PRE-BID MEETING WILL BE HELD Each proposal shall be signed by the full name and business address of each person or company interested in the same; shall be accompanied by a security bond by a bonding company authorized to do business in the State of Ohio, or by a certified check on some solvent bank in the amount of ten percent (10%) of the amount of the submitted proposal, the surety bond or certified check being payable to the City of Moraine, Ohio, as a guarantee that if the proposal is accepted, a contract will be entered into and its performance properly secured by a satisfactory bond in the amount of one hundred percent (100%) of the contract price. The City Council reserves the right to accept or reject any or all proposals; to waive any informalities or irregularities in the bids received or to accept any proposal which is deemed most favorable to the City of Moraine. The estimate for the work is $872,000.00 Completion- OCTOBER 30, 2025 1 Concrete Curb Removed 5,870 FT 2 202 Pavement Removal (Assume 12" Thick) 1,455 SY 3 204 Subgrade Compaction and Proof Rolling 1,455 SY 4 304 2" Aggregate Base 1,455 SY 5 452 10" Non-Reinforced Concrete Pavement, Class QC Misc.with Integrated Roll Curb 1,455 SY 6 519 Storm Structure Repair - Major 15 EA 7 519 Storm Structure Repair - Minor 30 EA 8 609 Concrete Curb, Replaced in kind 5,870 LF 9 611 Manhole Adjustment 3 EA 10 611 Water Valve Adjustment 2 EA 11 614 Maintaining Traffic 1 LUMP 12 646 Centerline, Solid Double Yellow, Epoxy 0.04 Mile 13 646 Crosswalk, 12", Epoxy 122 LF 14 646 Edge/Channelizing Line, 4", White, Epoxy 0.03 Mile 15 646 Lane Arrow, Epoxy 4 EA 16 646 Stop Bar, 24", Epoxy 72 LF 17 659 Hydroseeding and Mulching

Bid Results

Sidewalks / Parking Lot

$772,715.00

Public - City

Paving, Site Work

15

11

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
172
Bidding Soon
2,718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

April 11, 2025

Project location map

Multiple Locations, Moraine, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.