BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated May 29, 2025

Site work, paving and renovation of a mixed-use development in Kingston, Ontario. Completed plans call for the renovation of a educational facility.

202500064 Boiler replacement at Centennial Public School: Scope of project includes demolition of existing boilers, venting, and mechanical room piping. New boiler array complete with venting, primary/secondary pumps and accessories. Integration of new boiler plant into existing BAS system. Electrical work to support mechanical scope. Minor roofing work to suit renovation and final system balancing, commissioning, and start-up. 202500066 Exterior accessibility and paving at Centennial Public School: This project includes the removal of existing asphalt, concrete, and hardscapes to accommodate the construction. The site will undergo regrading on the south, west and east sides of the school. This project includes but is not limited to the removal of existing asphalt, concrete, and granular where specified, the supply and placement of granulars and new asphalt, and landscape reinstatement. For that reason, the Board recommends that respondents allow sufficient time to get to the site. Respondents arriving near the deadline do so at their own risk. Attendance is mandatory for the full length of the meeting and respondents must sign out when the site visit has concluded. Failure to meet any of the above will result in automatic disqualification from the tender process. Respondents shall attend the site meeting at their own risk and hold the Board harmless for any issues or damages arising out of their attendance of the site meeting. The Board will not consider any claims for additional payments during the execution of the Work for extra work or difficulties encountered resulting from conditions which were either visible or could be reasonably inferred from an examination of the Place of the Work and the available project information prior to the submission of Proposals. Question Deadline: Wed Mar 12, 2025 4:00:00 PM (EDT) 202500064 Boiler replacement at Centennial Public School - This project is to commence on June 30, 2025. Substantial performance of the contract shall be achieved no later than August 29, 2025. 202500066 Exterior accessibility and paving at Centennial Public School - This project is to commence on June 30, 2025. Substantial performance of the contract shall be achieved no later than August 22, 2025. Documents are available at https://ldsb.bidsandtenders.ca/

Award

Educational

$1,032,989.00

Public - State/Provincial

Paving, Renovation, Site Work

13

23

2

7

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
66
Bidding Soon
869
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

June 30, 2025

Project location map

120 Norman Rogers Dr, Kingston, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.