Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Renovation of a mixed-use development in Kingston, Ontario. Completed plans call for the renovation of a educational facility.

The scope of this project includes demolition of existing boilers, venting, and mechanical room piping. New boiler array complete with venting, primary/secondary pumps and accessories. Integration of new boiler plant into existing BAS system. Electrical work to support mechanical scope. Minor roofing work to suit renovation and final system balancing, commissioning, and start-up. Question Deadline: Tue Mar 11, 2025 4:00:00 PM (EDT) Duration in months: 2 Documents can be obtained from https://ldsb.bidsandtenders.ca/

Award

Educational

$556,700.00

Public - State/Provincial

Renovation

9

59

2

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
60
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

June 30, 2025

Project location map

190 Welborne Ave, Kingston, ON


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed