BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a sidewalk / parking lot in Bismarck, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 17, 2025 Project has been awarded to Brockmiller Construction but no awarded amount . PROJECT DESCRIPTION: PAVEMENT / SITE WORK A. The work of this contract comprises the Bismarck R-V School District, Bid Package #4, Parking Lot Upgrades. B. Construct the work under a Stipulated Sum contract. C. All work on the project, shall be executed as part of the work of this contract Location- 165 Campus Dr Bismarck, MO 63624 Information as to bidding instructions and requirements for procuring bidding documents may be obtained from the Architect. Not less than the prevailing hourly wage rates, as determined by the State of Missouri, Division of Labor Standards, shall be paid all workers employed on this project. Estimate: $450,000 The Board of Education intends to award a contract to the lowest responsible bidder complying with the terms of the letting. However, the Board of Education reserves the right to reject any or all bids; to reject any part of a bid; to accept any bid which it deems to be in its best interest; to advertise for and solicit new bids; and, to waive any informalities or technicalities in the bid requirements and specifications Question Deadline 03/04/2025 at 5:00 PM CT Requests for substitutions of materials must be made in writing . BID ALTERNATIVES: 1. AREA 'A': MILL AND ASPHALT OVERLAY. 2. AREA 'B': PATCH AND SEAL EXISTING ASPHALT The Bidder agrees to commence work as stipulated in the Contract Documents. Phase 1 (East): The Bidder hereby agrees to commence work on Monday, June 2, 2025, and complete this portion of the project by Friday, June 27, 2025, and as further defined in General and Supplementary Conditions, Article 8, “TIME”, and Article 8.3.3, Liquidated Damages. Phase 2 (West): The Bidder hereby agrees to commence work on Monday, July 7, 2025, and complete this portion of the project by Friday, August 8, 2025, and as further defined in General and Supplementary Conditions, Article 8, “TIME”, and Article 8.3.3, Liquidated Damages.

Award

Sidewalks / Parking Lot

$450,000.00

Public - City

Paving, Site Work

20

8

15

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
71
Bidding Soon
1,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

June 2, 2025

Project location map

165 Campus Dr, Bismarck, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.