BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2025 at 8:00 PM

Updated March 23, 2025

Site work for a road / highway in San Marcos, California. Completed plans call for site work for a road / highway.

The work generally consists of Replacement of traffic signal backplates with retroreflective backplates Citywide. All work shall be completed to the satisfaction of the Agency in conformance with the Contract Documents within One Hundred Fifty (150) Working Days after the date of commencement specified in the Notice to Proceed. The Contractor shall pay the City Liquidated Damages in the sum of $1,500 per day, for each and every calendar working day s delay in excess of the number of working days prescribed above. Online Q&A Online Q&A Yes Q&A Deadline 03/17/2025 4:00 PM (PST) Estimate cost : $580,000. The Contractor shall possess at the time the contract is awarded, a California Contractors license classification A. Each bid must be accompanied by bidders security equal to 10 percent of the bid. WORK DESCRIPTION The work generally consists of Replacement of traffic signal backplates with retroreflective backplates Citywide. A detailed Scope of Work can be found in the IFB Documents. IFB Conbid 25-03 Notice to Bidders CIP No. Tr008 Retroreflective Backplate Project State HSIP Project Number: HSIPSL-5381(045) A warranty bond in the form provided by the Agency and in the penal sum of at least twenty five percent (25%) of the Contract Sum License requirement shall be A or C-10 to act as Prime/Bidder. However, if Bidder has a C-10 license, the bidder must also hold a C-31 construction zone trac control license or include a subcontractor with a C-31 license. Not meeting this requirement will deem the bid unresponsive. It is the Contractor’s responsibility to provide trac control plans as part of the contract based on how the work will be performed and subject to review and approval by the City. Please refer to Section 600 and Section 601 in Greenbook and City Standard Special Provisions. Standard working hours are provided in Section 6-1.5 of the City Standard Special Provisions. Additional work hour restrictions will be coordinated with the work and corresponding trac control layout such as lane closures on major roads/ intersections.

Post-Bid

Roads / Highways

$580,000.00

Public - City

Site Work

7

11

2

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
613
Active Projects
257
Bidding Soon
3,447
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

April 21, 2025

Project location map

Multiple Locations, San Marcos, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.