Site work for a water / sewer project in Pender, Nebraska. Completed plans call for site work for a water / sewer project.
The Project includes the following Work: Select demolition, influent channel and grinder equipment, associated site concrete and/or structures, grating, stairs, associated piping, valves, and controls; miscellaneous mechanical/electrical equipment, and site modifications. Construction of two final clarifiers and installation of final clarification equipment. Influent pump station replacement of pumps and piping, installation of open channel equipment and structural modifications. Question Deadline 03/27/2025 Project Location: Village of Pender WWTF, Logan Creek Road, Pender, NE This project involves STATE REVOLVING FUND PROGRAM/FEDERAL AND STATE REQUIREMENT SECTION. To submit a bid, you need to include, Bid Form, Bid Bond, SRF Certification Forms, and proof of registration on Sam Gov. Please contact Nate O'Keefe will questions about this project Email: nokeefe@olsson.com Phone: 402.458.5979 Engineer's Estimate: $2.8 million dollars. (6% - MBE; 8% - WBE) 1. Select demolition activities at the existing wastewater treatment plant that include components of the influent channel, raw sewage pump station, final clarifier, site piping, site concrete, miscellaneous mechanical and electrical equipment, and site modifications. 2. Construction activities include providing all necessary materials, labor, equipment, and testing for the installation and/or construction of the following improvements: a. Influent Channel: Structural influent channel modifications and installation of pen channel grinder and associated mechanical, electrical, and controls components. b. Raw Sewage Pump Station: Removal and replacement of existing raw wastewater pumps. Replacement of piping and valves. Newsludge pump, piping, and valves. Installation of flow meters. All associated mechanical, electrical, and controls components. c. Aeration Basins: Construction of cast-in-place concrete effluent structures and associated piping and appurtenances. d. Aerobic Digester Basin: Installation of waste activated sludge (WAS) piping connection. e. Site Piping: Installation of clarifier influent, clarifier effluent, RAS/WAS piping, scum piping, air piping, and water service piping. f. Final Clarifiers: Construction of two new final clarifiers including cast-in-place concrete basins, clarifier equipment, influent, effluent, return activated sludge (RAS), and scum piping, connections to and inside of existing structures, and any other associated piping, valves, electrical, and controls. g. All work complete with connections to existing structures, sidewalks or paved roadways, site grading, erosion control, seeding, site piping, buriedvalves, mechanical, electrical, and controls components, demolition and modification, and other items of miscellaneous work which are either shown on the plans or described in the construction documents. 3. Project work shall include all required spare parts as listed in the specifications. 4. SWPPP and other Permitting Implementation. The Work will be substantially complete on or before May 31st , 2026 ; Final Completion- June 30th, 2026.
Award
Water / Sewer
$2,821,800.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
June 24, 2025
Logan Creek Rd, Pender, NE
Related To This Project
Pender, NE
Bid Date: May 06 2025
Pender, NE
--
Pender, NE
Bid Date: Mar 10 2025
Pender, NE
Bid Date: Mar 10 2025
Pender, NE
Bid Date: Apr 03 2025
Pender, NE
Bid Date: Mar 10 2025
Pender, NE
Bid Date: Dec 02 2024
Pender, NE
Bid Date: Mar 25 2024
Pender, NE
Bid Date: Mar 25 2024
Pender, NE
Bid Date: Mar 25 2024
Pender, NE
Bid Date: Feb 29 2024
Pender, NE
Bid Date: Jul 09 2020
Pender, NE
Bid Date: Nov 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.