BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated December 4, 2025

Site work for a mixed-use development in Ryley, Alberta. Completed plans call for site work for a municipal facility; road / highway; and water / sewer project.

End date updated as per Addendum 5.... Work includes: .1 Mobilization and demobilization of equipment to site, including construction of haul roads from the Cell 9 area to the stockpile areas, and any other haul roads required during construction, prime contractor duties, site safety, all temporary works and facilities necessary to complete the project, and demobilization including all restoration of temporary facilities and disturbed areas. .2 Stripping topsoil, subsoil, and unsuitable surface material from within the Cell 9 footprint, interior access road, surface water ditches, stockpile area (if required), and any other area to be disturbed during construction, and hauling of material to the appropriate stockpile area as shown on the drawings or directed by the Engineer. .3 Excavation of Cell 9, including the construction of Cell 9 interior access road, Cell 9 embankments, berms, and stockpiling of excess material. .4 Preparation of the subgrade layer in preparation of placement of the liner system (including slopes). .5 Excavation and backfill of the geosynthetics anchor trench as shown on the construction drawings. .6 Supply and Installation of the GCL. .7 Supply and Installation of the geomembrane liner. .8 Supply and installation of the drainage layer. .9 Supply and Installation of the Cell 9 leachate collection system (including, but not limited to, excavation of the trench and sump, supply and install of drainage aggregate, geotextile, and piping infrastructure/accessories). .10 Construction of the interior access road and associated surface water ditching. .11 Topsoiling and seeding of permanent ditches, embankment slopes, all disturbed areas, and seeding of stockpiles (as indicated on drawings) to aid in erosion control on-site. .12 Surveying, as required for the completion of all portions of the Work, which must include a detailed as-built geodetic survey of the entire Work area and all the Work performed including the base of clay liner and top of clay liner. To be provided to and approved by Engineer as construction progresses. Question Deadline 03/14/2025 at 2:00 PM MT Direct questions to Kiran Bhangu, email: engineering@claystonewaste.com .

Bid Results

Municipal

$5,292,159.00

Public - County

Site Work

16

18

14

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
19
Bidding Soon
444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

May 1, 2025

Project location map

50117 Range Rd 173, Ryley, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.