Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 31, 2025 at 8:00 PM
Updated December 4, 2025
Site work for a mixed-use development in Ryley, Alberta. Completed plans call for site work for a municipal facility; road / highway; and water / sewer project.
End date updated as per Addendum 5.... Work includes: .1 Mobilization and demobilization of equipment to site, including construction of haul roads from the Cell 9 area to the stockpile areas, and any other haul roads required during construction, prime contractor duties, site safety, all temporary works and facilities necessary to complete the project, and demobilization including all restoration of temporary facilities and disturbed areas. .2 Stripping topsoil, subsoil, and unsuitable surface material from within the Cell 9 footprint, interior access road, surface water ditches, stockpile area (if required), and any other area to be disturbed during construction, and hauling of material to the appropriate stockpile area as shown on the drawings or directed by the Engineer. .3 Excavation of Cell 9, including the construction of Cell 9 interior access road, Cell 9 embankments, berms, and stockpiling of excess material. .4 Preparation of the subgrade layer in preparation of placement of the liner system (including slopes). .5 Excavation and backfill of the geosynthetics anchor trench as shown on the construction drawings. .6 Supply and Installation of the GCL. .7 Supply and Installation of the geomembrane liner. .8 Supply and installation of the drainage layer. .9 Supply and Installation of the Cell 9 leachate collection system (including, but not limited to, excavation of the trench and sump, supply and install of drainage aggregate, geotextile, and piping infrastructure/accessories). .10 Construction of the interior access road and associated surface water ditching. .11 Topsoiling and seeding of permanent ditches, embankment slopes, all disturbed areas, and seeding of stockpiles (as indicated on drawings) to aid in erosion control on-site. .12 Surveying, as required for the completion of all portions of the Work, which must include a detailed as-built geodetic survey of the entire Work area and all the Work performed including the base of clay liner and top of clay liner. To be provided to and approved by Engineer as construction progresses. Question Deadline 03/14/2025 at 2:00 PM MT Direct questions to Kiran Bhangu, email: engineering@claystonewaste.com .
Bid Results
Municipal
$5,292,159.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
May 1, 2025
50117 Range Rd 173, Ryley, AB
Related To This Project
Ryley, AB
Bid Date: Mar 19 2025
Ryley, AB
Bid Date: Sep 05 2025
Ryley, AB
Bid Date: Sep 22 2025
Ryley, AB
Bid Date: Sep 09 2025
Ryley, AB
Bid Date: Mar 10 2025
Ryley, AB
Bid Date: Mar 10 2025
Ryley, AB
Bid Date: Feb 24 2025
Ryley, AB
Bid Date: Feb 06 2025
Ryley, AB
Bid Date: Jan 09 2025
Ryley, AB
--
Ryley, AB
Bid Date: Sep 27 2024
Ryley, AB
Bid Date: Sep 27 2024
Ryley, AB
Bid Date: Jul 19 2024
Ryley, AB
Bid Date: Jul 23 2024
Ryley, AB
Bid Date: Jul 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
