Published October 2, 2025 at 8:00 PM
Updated October 3, 2025
Site work and outdoor lighting for a mixed-use development in Ryley, Alberta. Completed plans call for site work for a municipal facility; road / highway; for outdoor lighting for a road / highway; and water / sewer project.
Work of this Contract includes the earthworks construction of the Compost Pad Expansion including roads, approaches, drainage ditching, berms, compost pad subgrade, geotextile, recycled concrete aggregate road surfacing, and a HDPE geomembrane lined Process Water Pond. This section is not prescriptive, and the Contractor shall still be governed by the work described in the various Contract Documents, Specifications and the Drawings. The scope of work for the Compost Pad Expansion includes the following: .1 Topsoil stripping in the compost pad area to the full depth as specified in the drawings and separate stockpiling of topsoil and subsoil material in on-site stockpile locations approved by the Owner. .2 Topsoil stockpile removal within footprint of construction area and relocation to the stockpiles outlined in the Drawings. .3 Run-off water management ditches development. .4 Rough grading of the Compost Pad, access roads, and Process Water Pond. Source separate and stockpile materials as described in Bid Documents and as directed by the Consultant. .5 Construction of access road subgrades and perimeter berms. .6 Subgrade preparation, including smooth drumming of the Compost Pad and Process Water Pond. .7 Supply and installation of geotextile on heavy traffic and light traffic areas on the Compost Pad and access roads. .8 Supply and installation of the surfacing aggregate over the Compost Pad and site access roads. .9 Supply and installation of non-woven geotextile. .10 Supply and installation of the High-Density Polyethylene (HDPE) geomembrane liner in the Process Water Pond. .11 Spark test Leak testing of the HDPE geomembrane liner by a qualified third party. .12 All associated works to meet the design intent of the Compost Pad Expansion construction. Optional scope of work for the Compost Pad Expansion includes the following: Placement of Owner supplied Recycle Concrete Aggregate material over the compost pad and site access roads. Question Deadline 09/05/2025 at 2:00 PM MT
Bid Results
Roads / Highways
$1,321,451.00
Public - County
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
October 22, 2025
50117 Range Rd 173, Ryley, AB
Related To This Project
Ryley, AB
Bid Date: Sep 09 2025
Ryley, AB
Bid Date: Sep 05 2025
Ryley, AB
Bid Date: Mar 19 2025
Ryley, AB
Bid Date: Mar 26 2025
Ryley, AB
Bid Date: Mar 10 2025
Ryley, AB
Bid Date: Mar 10 2025
Ryley, AB
Bid Date: Feb 24 2025
Ryley, AB
Bid Date: Feb 06 2025
Ryley, AB
Bid Date: Jan 09 2025
Ryley, AB
--
Ryley, AB
Bid Date: Sep 27 2024
Ryley, AB
Bid Date: Sep 27 2024
Ryley, AB
Bid Date: Jul 19 2024
Ryley, AB
Bid Date: Jul 23 2024
Ryley, AB
Bid Date: Jul 10 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.