Site work and outdoor lighting for a mixed-use development in Ryley, Alberta. Completed plans call for site work for a municipal facility; road / highway; for outdoor lighting for a road / highway; and water / sewer project.

Work of this Contract includes the earthworks construction of the Compost Pad Expansion including roads, approaches, drainage ditching, berms, compost pad subgrade, geotextile, recycled concrete aggregate road surfacing, and a HDPE geomembrane lined Process Water Pond. This section is not prescriptive, and the Contractor shall still be governed by the work described in the various Contract Documents, Specifications and the Drawings. The scope of work for the Compost Pad Expansion includes the following: .1 Topsoil stripping in the compost pad area to the full depth as specified in the drawings and separate stockpiling of topsoil and subsoil material in on-site stockpile locations approved by the Owner. .2 Topsoil stockpile removal within footprint of construction area and relocation to the stockpiles outlined in the Drawings. .3 Run-off water management ditches development. .4 Rough grading of the Compost Pad, access roads, and Process Water Pond. Source separate and stockpile materials as described in Bid Documents and as directed by the Consultant. .5 Construction of access road subgrades and perimeter berms. .6 Subgrade preparation, including smooth drumming of the Compost Pad and Process Water Pond. .7 Supply and installation of geotextile on heavy traffic and light traffic areas on the Compost Pad and access roads. .8 Supply and installation of the surfacing aggregate over the Compost Pad and site access roads. .9 Supply and installation of non-woven geotextile. .10 Supply and installation of the High-Density Polyethylene (HDPE) geomembrane liner in the Process Water Pond. .11 Spark test Leak testing of the HDPE geomembrane liner by a qualified third party. .12 All associated works to meet the design intent of the Compost Pad Expansion construction. Optional scope of work for the Compost Pad Expansion includes the following: Placement of Owner supplied Recycle Concrete Aggregate material over the compost pad and site access roads. Question Deadline 09/05/2025 at 2:00 PM MT

Bid Results

Roads / Highways

$1,321,451.00

Public - County

Outdoor Lighting, Site Work

9

12

6

2

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
23
Bidding Soon
424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2025

October 22, 2025

Project location map

50117 Range Rd 173, Ryley, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.