BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2025 at 7:00 PM

Updated March 19, 2025

This is a service / maintenance or supply contract in Riverside, California. Contact the soliciting agency for additional information.

License Requirements Company and/or its key personnel, shall hold an appropriate license for the Company's discipline and the Services on the date the Proposal is submitted. One Hundred-Twenty (120) Days Question Deadline 03/04/2025 at 2:00 PM PT Online Q&A Yes The scope of work includes the supply and delivery of 1) emulsion polymer, 2) dry polymer and 3) alumer on an as needed basis to the Riverside Water Control Plant (RWQCP). Emulsion polymer will be used to enhance diffused air floatation thickening of waste activated sludge and to dewater digested sludge from an anaerobic digestion process using centrifuges and/or screw presses. Dry polymer will serve as a backup for dewatering digested sludge from anaerobic digestion using belt presses.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
606
Active Projects
272
Bidding Soon
3,444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

Project location map

5950 Acorn St, Riverside, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.