EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2025 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a pre-engineered storage facility in Colorado Springs, Colorado. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Reference Number 0000378247 Job Location: Doherty High School This project entails the construction of a high school sports fieldhouse using a prefabricated metal building system. The fieldhouse will be used for multiple athletic activities, including physical education classes. The facility will include a storage space and multi-purpose athletic This project entails the construction of a high school sports fieldhouse using a prefabricated metal building system. The fieldhouse will be used for multiple athletic activities, including physical education classes. The facility will include a storage space and multi-purpose athletic space. Anticipated Award Date 03/28/2025 The designated period of performance will be from Date of Award through September 30, 2025 preferred or November 30, 2025 if needed. Substantial Completion.* Contractor must fully complete project by February 28, 2026. Question Deadline 03/11/2025 at 12:00 PM MT Questions are submitted online Yes, Contractors are to submit written questions through online to the Contracting Office.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$3,000,000.00

Public - City

New Construction, Site Work

55

7

33

6

Subscribe For Documents

145 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Warranties
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
52
Bidding Soon
704
All Active Projects
328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

May 20, 2025

img_map_placeholder

4515 Barnes Rd, Colorado Springs, CO


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Doherty Field House

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.