Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2025 at 8:00 PM
Updated March 28, 2025
Site work and renovation of a civil project in Creston, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Construct improvements including all labor, materials and equipment necessary for excavation, backfill and sitework; reinforced concrete; greenhouse work including plumbing, heating, ventilating, doors, and associated work; revolving algal biofilm (RAB) system work; pumps; electrical work including conduit, cables, wiring, motor controls, starters, switches, fixtures and controls; piping and appurtenances; and miscellaneous associated work, including cleanup. The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. The Wastewater Treatment Facility Nutrient Reduction Improvements shall be in operation and treating wastewater by June 1, 2026 subject to any extensions of time which may be granted by the City. All work on the contract shall be completed by November 1, 2026. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that the Wastewater Treatment Facility Nutrient Reduction Improvements is not in operation treating wastewater after June 1, 2026 with due allowance for extensions due to conditions beyond the control of the contractor. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa chartered bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to 5% of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of the bid.
Bid Results
Water / Sewer
$500,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2025
May 1, 2025
To Be Determined, Creston, IA
Related To This Project
Creston, IA
Bid Date: Apr 03 2025
Creston, IA
Bid Date: Apr 03 2025
Creston, IA
Bid Date: Jul 09 2025
Creston, IA
Bid Date: May 20 2025
Creston, IA
Bid Date: Apr 11 2025
Creston, IA
Bid Date: May 16 2025
Creston, IA
Bid Date: May 30 2025
Creston, IA
Bid Date: May 29 2025
Creston, IA
Bid Date: Feb 27 2025
Creston, IA
Bid Date: Oct 31 2024
Creston, IA
Bid Date: Oct 08 2024
Creston, IA
Bid Date: Oct 24 2024
Creston, IA
Bid Date: Sep 12 2024
Creston, IA
--
Creston, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
