Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 26, 2025 at 8:00 PM
Updated April 27, 2025
Site work and paving for a mixed-use development in Creston, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Question Deadline 03/27/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Work on the improvement shall be commenced immediately upon issuance of a written Notice to Proceed and be completed as stated below. Division 1 - Installation of approximately 1,771 LF of 6" through 10" Water Main, Trenched; 8,863 LF of 6" through 10" Water Main, Trenchless; 3,469 LF of Water Service Pipe, Type K Copper, 1" to 2"; 127 EA of Water Service Pipe, Corporation, 1" to 2"; 119 EA of Water Service Curb Stop and Box, 1" to 2"; 53 Gate Valves, 6" to 12"; 2 EA of Tapping Valve Assembly; 21 EA of Fire Hydrant Assembly; 35 EA of Water Main Connections; 4,036 SY of Removal and Replacement of Pavement, PCC 7" Thick; 988 SY of Removal and Replacement of Sidewalk; 25 SY of Removal and Replacement of Driveway and miscellaneous associated work. See Bid Proposal for complete list of quantities. Division 2 - Installation of approximately 4593 LF of 6" through 8" Water Main, Trenched; 1,939 LF of Water Service Pipe, Type K Copper, 1"; 75 EA of Water Service Pipe, Corporation, 1"; 72 EA of Water Service Curb Stop and Box, 1"; 16 EA of 6" to 8" Gate Valve; 8 EA of Fire Hydrant Assembly; 7 EA of Water Main Connections; 4,832 SY of Removal of and Replacement of Pavement, PCC, 7" Thick and miscellaneous associated work. See Bid Proposal for complete list of quantities. Division 3 - Installation of approximately 127 LF of 6" through 12" Water Main, Trenched; 2,735 LF of 12" Water Main, Trenchless; 169 LF of Water Service Pipe, Type K Copper, 1"; 6 EA of Water Service Pipe, Corporation, 1"; 6 EA of Water Service Curb Stop and Box, 1"; 7 EA of 6" through 12" Gate Valve; 1 EA of Tapping Valve Assembly, 12"X12; 2 EA of Fire Hydrant Assembly; 5 EA of Water Main Connections; 177 SY of Removal and Replacement of Pavement, PCC, 7" Thick and miscellaneous associated work. See Bid Proposal for complete list of quantities. Division 4 - Installation of approximately 35 LF of 6" Water Main, Trenched; 2,854 LF of 6" Water Main, Trenchless; 1,298 LF of Water Service Pipe, Type K Copper, 1" ; 43 EA of Water Service Pipe, Corporation, 1"; 43 EA of Water Service Curb Stop and Box, 1"; 7 EA of Gate Valve, 6"; 2 EA of Tapping Valve Assembly, 6"X6"; 4 EA of Fire Hydrant Assembly; 6 EA of Water Main Connections; 82 SY of Removal and Replacement of Pavement, PCC, 7" Thick; 27 SY of Removal and Replacement of Sidewalk and miscellaneous associated work. See Bid Proposal for complete list of quantities. A refund of $50.00 for plans and specifications will be made to those returning them in good condition within fourteen (14) days after the Notice of Award. Bid Results :: Division 1 :: United Utilities & Excavation :: $2,820,544.00 Division 2 :: CJ Conservation :: 1,079,799.91 Division 3 :: Crain Construction :: $509,730.50 Division 4 :: C&J Conservation :: $395,480.00
Bid Results
Water / Sewer
$4,805,555.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
June 1, 2025
Multiple Locations, Creston, IA
Related To This Project
Creston, IA
Bid Date: Jul 09 2025
Creston, IA
Bid Date: May 20 2025
Creston, IA
Bid Date: Apr 11 2025
Creston, IA
Bid Date: May 16 2025
Creston, IA
Bid Date: May 30 2025
Creston, IA
Bid Date: May 29 2025
Creston, IA
Bid Date: Jul 15 2025
Creston, IA
Bid Date: May 16 2019
Creston, IA
Bid Date: Apr 03 2025
Creston, IA
Bid Date: Mar 27 2025
Creston, IA
Bid Date: Feb 27 2025
Creston, IA
Bid Date: Oct 31 2024
Creston, IA
Bid Date: Oct 08 2024
Creston, IA
Bid Date: Oct 24 2024
Creston, IA
Bid Date: Sep 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
