BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a transportation facility in Farmington, Missouri. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

As of September 9, 2025, city council awarded an engineering firm. The City of Farmington, Missouri ("Sponsor"), is hereby soliciting statements of qualifications and experience from qualified consultants for airfield development projects at Farmington Regional Airport (KFAM). Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: 1. Taxiway Pavement Rehabilitation. Estimated cost: $400,000 2. Design Phase Services - Runway Extension. Estimated cost: $1,000,000 3. Extend Runway 2/20 to 5,000 LF. Estimated Cost: $5,500,000 The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the Sponsor's discretion, this selection can be retained for projects initiated within five years or until all projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Woolpert (Jviation) assisted the Sponsor with preparation of their CIP and the above cost estimates. A qualification based selection process conforming to FAA Advisory Circular 150/5100-14 will be utilized to select the most qualified firm. Selection criteria will include, but may not be limited to: o Recent experience in airport projects o Capability to perform all aspects of project o Ability to meet schedules within budget o Knowledge of FAA/MoDOT design and construction standards o Knowledge of FAA/MoDOT regulations, policies and procedures o Quality of previous airport projects undertaken o Personnel experience and qualifications o Familiarity with, and proximity to the project o An implemented Affirmative Action Program Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or cost information when responding to this solicitation. Prospective consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to submit a copy of their current overhead rate audit certification or MoDOT pre-approval. Questions regarding this solicitation can be directed to Gregory S. Beavers at 573.756.1701. The method of Contractor Selection has not been Determined at this time.

Award

Transportation Terminals

$6,900,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
120
Bidding Soon
1,167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2025

Project location map

1436 Perrine Rd, Farmington, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.