Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 17, 2025 at 8:00 PM
Updated June 19, 2025
Site work and paving for a road / highway in Farmington, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of May 21, 2025, project is awarded to the following contractors: 1. ROAD: Aulsbury Chapel: Leadbelt Materials - $307,874.14 2. ROAD: Cedar Run Rd: Leadbelt Materials - $635,991.88 3. ROAD: Evanko: Leadbelt Materials - $139,838.97 4. ROAD: Groom: Leadbelt Materials - $102,496.93 5. ROAD: Hwy DD (OO to Wesley Chapel): Leadbelt Materials - $74,055.03 6. ROAD: Hillsboro (Hwy K - Lambeth): Leadbelt Materials - $51,003.12 7. ROAD: Pattreson School Rd: Leadbelt Materials - $286,455.34 8. ROAD: Smith Rd: Leadbelt Materials - $193,736.70 9. ROAD: Sugar Grove: Leadbelt Materials - $145,966.32 10. ROAD: Westover Road: Leadbelt Materials - $275,505.66, with a total amount of $2,212,924.09. The County Commission of St. Francois County reserves the right to reject any or all bids for any reason deemed justifiable. Contractor will be responsible for providing the labor, materials, equipment, tools, supplies, employees, drivers and safety training and certification, insurance (including workers' compensation and general liability) for the Work described in this Notice, for the following proposed Work: District 1: HWY DD (OO HWY-Wesley Chapel Rd.), Sugar Grove Rd., Groom Rd., Smith Rd. District 2: Westover Rd., Hillsboro Rd. (K HWY - Lambeth), Cedar Run Rd., Evanko Rd., Patterson School Rd. and Aulsbury Chapel Rd. Finalized scope or work may be modified based on bid totals and budgetary restraints. The work shall consist of a bituminous overlay on an existing asphalt surface. In the event that the road surface is not existing asphalt, the overlay preparation shall be agreed upon between the contractor and the Highway Administrator. Bid results - ROAD: Hillsboro (Hwy K - Lambeth) - Leadbelt Materials - $51,003.12 ROAD: Evanko - Leadbelt Materials - $139,838.97 ROAD: Pattreson School Rd - Leadbelt Materials - $286,455.34 ROAD: Groom - Leadbelt Materials - $102,496.93 ROAD: Sugar Grove - Leadbelt Materials - $145,966.32 ROAD: Smith Rd - Leadbelt Materials - $193,736.70 ROAD: Westover Road - Leadbelt Materials - $275,505.66 Leadbelt Materials - Leadbelt Materials - $307,874.14
Award
Roads / Highways
$2,212,924.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2025
May 29, 2025
Multiple Locations, Farmington, MO
Related To This Project
Farmington, MO
Bid Date: May 16 2025
Farmington, MO
Bid Date: May 27 2025
Farmington, MO
Bid Date: May 22 2025
Farmington, MO
Bid Date: May 28 2025
Farmington, MO
Bid Date: Jun 17 2025
Farmington, MO
Bid Date: Jun 17 2025
Farmington, MO
Bid Date: Jun 24 2025
Farmington, MO
Bid Date: Jun 24 2025
Farmington, MO
Bid Date: May 06 2025
Farmington, MO
Bid Date: Apr 22 2025
Farmington, MO
Bid Date: Apr 03 2025
Farmington, MO
Bid Date: Mar 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
