BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2025 at 8:00 PM

Updated June 19, 2025

Site work and paving for a road / highway in Farmington, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of May 21, 2025, project is awarded to the following contractors: 1. ROAD: Aulsbury Chapel: Leadbelt Materials - $307,874.14 2. ROAD: Cedar Run Rd: Leadbelt Materials - $635,991.88 3. ROAD: Evanko: Leadbelt Materials - $139,838.97 4. ROAD: Groom: Leadbelt Materials - $102,496.93 5. ROAD: Hwy DD (OO to Wesley Chapel): Leadbelt Materials - $74,055.03 6. ROAD: Hillsboro (Hwy K - Lambeth): Leadbelt Materials - $51,003.12 7. ROAD: Pattreson School Rd: Leadbelt Materials - $286,455.34 8. ROAD: Smith Rd: Leadbelt Materials - $193,736.70 9. ROAD: Sugar Grove: Leadbelt Materials - $145,966.32 10. ROAD: Westover Road: Leadbelt Materials - $275,505.66, with a total amount of $2,212,924.09. The County Commission of St. Francois County reserves the right to reject any or all bids for any reason deemed justifiable. Contractor will be responsible for providing the labor, materials, equipment, tools, supplies, employees, drivers and safety training and certification, insurance (including workers' compensation and general liability) for the Work described in this Notice, for the following proposed Work: District 1: HWY DD (OO HWY-Wesley Chapel Rd.), Sugar Grove Rd., Groom Rd., Smith Rd. District 2: Westover Rd., Hillsboro Rd. (K HWY - Lambeth), Cedar Run Rd., Evanko Rd., Patterson School Rd. and Aulsbury Chapel Rd. Finalized scope or work may be modified based on bid totals and budgetary restraints. The work shall consist of a bituminous overlay on an existing asphalt surface. In the event that the road surface is not existing asphalt, the overlay preparation shall be agreed upon between the contractor and the Highway Administrator. Bid results - ROAD: Hillsboro (Hwy K - Lambeth) - Leadbelt Materials - $51,003.12 ROAD: Evanko - Leadbelt Materials - $139,838.97 ROAD: Pattreson School Rd - Leadbelt Materials - $286,455.34 ROAD: Groom - Leadbelt Materials - $102,496.93 ROAD: Sugar Grove - Leadbelt Materials - $145,966.32 ROAD: Smith Rd - Leadbelt Materials - $193,736.70 ROAD: Westover Road - Leadbelt Materials - $275,505.66 Leadbelt Materials - Leadbelt Materials - $307,874.14

Award

Roads / Highways

$2,212,924.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
136
Bidding Soon
1,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

Multiple Locations, Farmington, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.