Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 8, 2025 at 8:00 PM
Updated April 9, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Nephi, Utah. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Description : Deck Repair/Replacement County: Juab This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. Electronic Files/models Provided on Contractor Zone. The Department Will Not Hold Retention on This Project. Per Utah State Code 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code 13-8-5 (1) for More Information. DBE Goal:4.00% Wage Rates: Apply Mandatory Prequalification Required (Qualified Health Insurance Required) Engineer's Estimate: Greater than $10M but less than or equal $15M Each Bidder Must Submit an Electronic Bid Bond From an Approved Surety Company Through the Appropriate Clearinghouse, as Defined in the Udot E-bidding Guide, Using Udot's Bidding Business System or in Lieu Thereof, Cash, Certified Check, or Cashier's Check for Not Less Than 5% of the Total Amount of the Bid, Made Payable to the Utah Department of Transportation, Showing Evidence of Good Faith and a Guarantee That if Awarded the Contract, the Bidder Will Execute the Contract and Furnish the Contract Bonds as Required. The Right to Reject Any or All Bids is Reserved. As Required, a Contractor's License Must Be Obtained From the Utah Department of Commerce to Work on Udot Projects as Defined From the Division of Professional Licensing. Prequalification of Bidders is Required. Prior to Submitting a Bid, the Bidder Must Have on File With the Utah Department of Transportation a Completed and Approved Contractor's Application for Prequalification. Department Processing Time is 20 Working Days From Receipt of Properly Executed Documentation. UTDOT - I-15 Bridge Rehabilitation West of Levan *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$14,099,290.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2025
May 26, 2025
I-15, Nephi, UT
Related To This Project
Nephi, UT
Bid Date: May 07 2025
Nephi, UT
Bid Date: May 21 2025
Nephi, UT
Bid Date: May 21 2025
Nephi, UT
--
Nephi, UT
--
Nephi, UT
Bid Date: Sep 17 2025
Nephi, UT
--
Nephi, UT
--
Nephi, UT
--
Nephi, UT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
