BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated April 12, 2025

Site work and paving for a road / highway in Carmi, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Schumaker Street Roadway Improvements Work on this project is being funded through the State of Illinois Rebuild Illinois grant program administered by the Illinois Department of Commerce and Economic Opportunity (DCEO). Attention is called to the fact that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin; work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted by P.A. 95-0635; and this contract is subject to the following State of Illinois Legislation: The Illinois Prevailing Wage Act (820 ILCS 130); Requires contractors and subcontractors to pay laborers, workers, and mechanics performing services on public works projects no less than the current "prevailing rate of wages" (hourly cash wages plus amount for fringe benefits) in the county where the work is being performed. Illinois Works Jobs Program Act (30 ILCS 559/20-1 et seq.); Contractors will be required to use apprentices for 10% of total labor hours worked in each prevailing wage classification on a project, or 10% of the estimated labor hours performed on a project and the total labor hours performed by apprentices for each prevailing wage category. Employment of Illinois Workers on Public Works Act (30 ILCS 570/0.01 et seq.):Provides that whenever there is a period of excessive unemployment in Illinois (as such project. defined by the Act), then the Grantee shall employ at least 90% Illinois laborers on Neither the State of Illinois nor any of its Departments, Agencies, or employees is or will be a party to this Advertisement for Bids or any resulting Contract. Any contract with an amount over $25,000 is required to produce documentation of performance bonding within 10 days of contract award. The contractor will obtain a performance bond for 100% of the contract price to ensure completion of the contract. Any contract with an amount over $50,000 requires the contractor to produce documentation of a payment bond for 100% of the contract price to ensure payment to all persons supplying labor and materials . The City of Carmi reserves the right to reject any or all bids or to waive any informalities in the bidding. The City of Carmi may hold the bids for a period not to exceed 30 days from the date of the opening of the bids for the purpose of reviewing the bids and investigation the qualifications of bidders, prior to awarding of the Contract.

Post-Bid

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
67
Bidding Soon
742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

Project location map

Schumaker St, Carmi, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.