BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated April 1, 2026

Site work and new construction of a mixed-use development in Beloit, Kansas. Completed plans call for the construction of a warehouse / distribution facility; for site work for a warehouse / distribution facility; and water / sewer project.

The Project for Contract I includes the following Work: Water Treatment Plant Improvements including modifications to the existing presedimentation basin, a new Ultrafiltration (UF) feed tank and pump station, new UF system, new Reverse Osmosis (RO) system, a new metal building, site work, electrical work, and miscellaneous appurtenances. The Project for Contract II includes the following Work: Water Supply Improvements including a new booster pump station and building, site work, electrical work, approximately 61,550 LF of 14" DR 25 C900 PVC waterline, gate valves, stream crossings, road crossings, testing stations, marker posts, railroad crossing, connections to existing waterlines, modifications to the existing water treatment plant lagoons, and miscellaneous appurtenances. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Jeff Shamburg, P.E E-mail: jshamburg@schwab-eaton.com Phone: 785-404-3139. Doc Notes: Unless stated otherwise, all orders placed are non-refundable. Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies. Contract Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Please note: Download file release is not automated. Orders for downloads may take up to an hour to be processed. Local pickup available at: Drexel Technologies, 10840 West 86th Street, Lenexa, Kansas 66214-1632, (913) 371-4430. Question Deadline 04/01/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing, Jeff Shamburg, P.E. E-mail: jshamburg@schwab-eaton.com Bid-Results:- 1. CONTRACT 1 - BELOIT WATER TREATMENT PLANT-Walters-Morgan Construction-$ 32,350,000 2. CONTRACT II - WATER SUPPLY IMPROVEMENTS - PVC Alternate-Midlands Contracting- $ 3,030,225 3. CONTRACT II - WATER SUPPLY IMPROVEMENTS - HDPE Alternate-Marsau Enterprises Inc- $ 3,115,569

Bid Results

Water / Sewer

$38,495,794.00

Public - City

New Construction, Site Work

195

35

69

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

215 S Chestnut St, Beloit, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.