BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 22, 2025

Site work for a sidewalk / parking lot in Fort St. James, British Columbia. Completed plans call for site work for a sidewalk / parking lot.

The District of Fort St. James invites qualified contractors to submit quotes for the removal and replacement of approximately 800 feet of sidewalk, curb, and gutter on Douglas Ave, from Douglas Street Bridge to School Road. Existing sidewalk has a length of approximately 800 feet and are 5 feet wide with 6-inch curbs and standard gutters. Removal and replacement of approximately 800 feet of existing sidewalk, curb, and gutter. Repair and prepare the base as required. All hauling and disposal of excess material, old sidewalk, cement curb, or gutter materials, or debris.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
15
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

June 1, 2025

Project location map

Douglas Ave, Fort St. James, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.