EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Pottstown, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

Towpath Park Phase 1 Improvements Questions Due Date: Mar 21st 2025, 12:00 PM EDT A certified check or bank draft, payable to the order of East Coventry Township, negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to ten percent (10%) of the total bid amount shall be submitted with each Bid. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. The successful Bidder will be required to furnish and pay for Satisfactory Performance and Payment Bond and Labor and Materialmen's Bond. Attention is called to the fact that not less than the minimum salaries and wages set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Bidders are required to comply with the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442. East Coventry Township reserves the right to reject any or all Bids or to waive any informalities or irregularities in the bidding when, in the opinion of the Township, such rejections or waivers shall be to its interest or advantage. Prior to awarding the contract, bids may be held by the Township for a period not to exceed sixty (60) days from the date of bid openings for the purpose of reviewing the Bids and investigating the qualifications of bidders. SCOPE OF WORK A. The Contractor shall supply all labor, tools, equipment, materials, and services necessary to install the erosion and sedimentation control devices shown in the drawings and/or as described in this specification, to perform their continued repair and maintenance during construction, and remove all devices and make necessary repairs upon completion of work. A copy of the approved erosion and sedimentation control plan shall be always on site and available

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Site Work

32

20

6

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
205
Bidding Soon
2,893
All Active Projects
1,396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 15, 2025

img_map_placeholder

1675 New Schuylkill Rd, Pottstown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Towpath Park Phase 1 Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.