Site work for a water / sewer project in Elyria, Ohio. Completed plans call for site work for a water / sewer project.

Murray Ridge Water Tower Improvements The Contractor shall furnish all labor, equipment, supplies, and supervision of labors necessary to complete the work. This project includes abrasive blast cleaning and recoating of the interior (dry and wet) and exterior of a 0.30 Million Gallon Elevated Storage Tank at 1033 Murray Ridge Rd. in Elyria, Ohio. The project will include structural repairs, safety upgrades, new water quality equipment and other misc. improvements as shown on construction plans and specifications prepared by the Office of the Elyria City Engineer or its Consultant. BID SECURITY: The bid must be accompanied by a bid guaranty. The bid guaranty must meet all requirements of Section 153.54 of the ORC and the Instructions to Bidders COMPLETION TIME: The contractor will have 120 calendar days to substantially complete the work from Notice of Commence Work. PREVAILING WAGES: The contractor and any subcontractor must comply with the prevailing wage rate requirements on public improvements in Lorain County and the City of Elyria, Ohio, as determined by the Ohio Bureau of Employment Services, Wage and Hour Division (614) 644-2239. A complete listing of prevailing wage rates on public improvements in Lorain County may be obtained from the City of Elyria Engineer's Office at (440) 326-1444 or at www.ohio.gov/laws. Please note it is the Contractor's responsibility to know the prevailing wage rates on public improvements in Lorain County. COMPLIANCE WITH ALL LAWS: All work shall be carried out in compliance with all federal, state and local laws, rules and regulations that apply to the work. Any project specification item in conflict with a federal, state, or local law, rule or regulation, shall be void. AWARD OF CONTRACT: The City reserves the right to waive any technicalities or informalities, to reject any or all bids received, and to accept any bid with any combination of alternates which is deemed most favorable to the City of Elyria, Ohio at the time and under the conditions stipulated in the project documents.

Bid Results

Water / Sewer

$996,600.00

Public - City

Site Work

6

12

4

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Terrazzo Flooring, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Voltage Regulators, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Manufacturing Lines and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
94
Bidding Soon
1,329
All Active Projects
572
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

img_map_placeholder

1033 Murray Ridge Rd, Elyria, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Murray Ridge Water Tower Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.